Change Order No 4 - Coal Line Trail, Phase IIB Proj No. 122-035 - INDOT Milestone
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 4 - Coal Line Trail, Phase IIB Proj No. 122-035 - INDOT Milestone
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 12:13:26 PM
Creation date
11/14/2023 2:16:44 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:B -44292 INDIANA <br />Change Order No:004 Department of Transportation <br />Contract: B -44292 <br />Project: 2200199 - State:220019900LC4 <br />Change Order Nbr: 004 <br />Change Order Description: Connection change to water fountain <br />Reason Code: CHANGED COND, Constructability Related <br />CLN PCN PLN Item Code Unit Unit Price <br />0055 2200199 0055 720-04815 EACH 4,500.000 <br />Item Description: DRYWELL <br />Supplemental Descriptionl: <br />Supplemental Description2: <br />0084 2200199 0084 715-11896 EACH 11,881.520 <br />Item Description: WATER SERVICE CONNECTION <br />Supplemental Descriptionl: Change of connection point <br />Supplemental Description2: <br />CO Qty Comment <br />-1.000 C <br />Date:10/14/2023 <br />Page: 3 <br />Amount Change <br />Amount:$-4,500.00 <br />1.000 C Amount:$ 11,881.52 <br />Total Value for Change Order 004 = $ 7,381.52 <br />Contract Completion Date Time Adjustment <br />Original Completion dt: 05/01/2024 Adj comp) dt 05/08/2024 Adj No. of Days 2 <br />Explanation: This is to bore and install water connection that needed to be adjusted due to issues with the origninal connection point. <br />Milestone Time Adjustment <br />MileStone Nbr: 01 <br />Milestone Description: CSGP INTERMEDIATE COMPLETION DATE <br />Original Completion dt: 09/01/2023 Adj compl dt 09/08/2023 Adj No. of Days 2 <br />Explanation: This is to bore and install water connection that needed to be adjusted due to issues with the origninal connection point. <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />Site Furnishing in the Contract Information Book and the Q&A Form indicates the drinking fountain to be connected to the existing water line <br />crossing Riverside Drive. The water main crossing Riverside Drive is 30-inch diameter, and a service line tap cannot be made on that large of a <br />main. Approximately 100 LFT north and 50 LFT west of the drinking fountain location a 10-inch water line can be tapped to service the drinking <br />fountain. The service is to be metered, so a meter pit was added. There was no detail in the plans showing to have a way to drain the pressure <br />line, this was added. A fee was added for the City to complete the live tap. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:_fv—■►S •,V�1 Signed By: <br />Date: Z42 I IQ <br />?ilk <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />