Laserfiche WebLink
ALTERATIONS: <br />Throughout <br />COA 2019-0402 approved conditionally 1. Lighting, with condition of staff approval 2. Sign locations, not <br />sign design 3. Furnishings and Garden Ornaments with exception of the backed, non-custom metal <br />benches around the fountain to be the backless benches, only 4. Planting Design. <br />COA 2019-0109 approved conditionally 1. Pedestrian circulation improvements and pathways, with condition <br />of staff approval over memorials and landscaping 2. New playground 3. Studebaker Fountain and <br />associated gathering place 4. Removal of Duck Pond, with condition that “reseed the lawn” is not <br />approved but instead requires a plan be submitted to the Commission to interpret the Duck Pond in <br />another way 5. Concept of a formal river overlook with final design to be approved by Commission. <br />RMEs and COAs for tree trimming, removal, and installation have been approved under the guidance of the <br />City Forester. <br />RMEs and COAs for sidewalks have been approved. <br /> <br />Leeper Park East <br />AA 2022-0810 allowed for the installation of a staircase and landscaping leading to the Rose Garden. <br />AA 2020-0422 allowed for the installation of two wooden trellis in the Rose Garden. <br />COA 2020-0302 (DENIED) requested the removal of the Navarre Cabin, to be moved to The History Museum <br />campus. <br />COA 2019-0108 allowed for the installation of a new water pump structure. <br />RME 2017-0410 approved “This permit covers only Phase I of the project - drilling a pilot well. Phase II <br />(drilling the actual well and trenching in the piping) will require a separate COA.” <br />COA 2017-0306 approved installation of new stage and new audience seating, landscape beautification and <br />lighting for stage, new benches with concrete pad closer to stage. <br />RME 2016-1013 approved removal of brush and planting of willow tree near Rose Garden. <br />The Sunken (Rose) Garden with reflecting pool and statuaries were removed in the 1960s. RME 2017-1012 <br />approved installation of two small concrete pads with two benches adjacent to Rose Garden. Benches <br />to match those approved through COA 2015-0302A. COA 2017-0228 approved installation of 8’ wide <br />crushed limestone walkway connecting the Michigan Street sidewalk with the Sunken Garden, <br />bounded by two, 42” wide flower beds, and irrigation system for entire garden. COA 2015-1002 <br />approved “Within an existing concrete curb (that will remain), the landscaping bed will be enhanced to <br />mimic the reflecting pool formerly within its boundary. New flower beds will be defined using new <br />soil, compost and plantings. A walkway of crushed limestone will pass through the beds. Additional <br />half circle beds will be added to the north and south of the concrete curb. The "three-fates" statues will <br />be repaired pro-bono by a local artist, and then placed into the center of the "pool" bed, where they <br />were originally, in the same back-to-back-to back style; and the one remaining "cherub" will be <br />nearby, on a footing. That "cherub" will be duplicated from the original, and the new statue also placed <br />nearby in the "pool" bed.” COA 2015-0504A approved restoration of Rose Garden and gravel path <br />system by volunteers. <br />COA 2015-0908 approved “Bartlett Street Roundabout Project Description (114-032b). Project to construct a <br />roundabout at Bartlett and Michigan Street approved per all diagrams and documents submitted. <br />Encroachment to Leeper Park East will be limited to 0.57 acres and all trees removed will be replaced <br />within the park.” <br />The Garden of Fragrance no longer exists, but the signage remains. RME 2015-0422 approved <br />“Rebuild/restack low retaining wall currently located in Leeper Park next to Garden for the Blind. <br />Matching flagstone has been donated by Knepp Sand and Stone and Old Fort Building Supply; and <br />follows material estimate made by a representative of the SB Parks Department. The restacking of the <br />flagstone wall will also require digging away the dirt around loose blocks and backfilling afterwards.” <br />COA 2011-1103A approved “Replace the existing lift station on the south side of the North Pumping Station <br />driveway and relocate it to the north side of the driveway. Screen the new location with landscaping <br />and plantings. Rehabilitate the Garden of Fragrance Braille marker and boulder monument and install <br />new sidewalks and decorative paving. All per diagrams, plans and plant palette submitted and <br />approved.” <br />Wading Pool was filled in and the pergola removed, 1970s.