Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:53:14 AM
Creation date
10/24/2023 1:28:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Printed on Fri Oct 13, 2023 at 08:03 am EDT <br />I� <br />Job #: 6968 MLK Dream Center <br />1522 Linden Avenue <br />GARMOHG <br />South Bend, Indiana 46628 <br />Garrnon9 Construction - Fort Wayne Office <br />Y Subject Status Responalble Received From A"Nnee Date lnitU tad RFJ Due Data Closed Daly Ball In Court <br />Location Schedule Cost Cast <br />Contractor Memi4or <br />Impact Cede Impact <br />A: Rochelle Gardner (C-H. Garmong & Son, Inc- Terre Haute) Responded Wed Aug Z3.20Z3 at 11:OZ am EDT <br />This is Operations call- My suggestion is an} -sheet metal and trim required for the complete installation. Also refer to the clarification items included under Thermal & Molstera Protection. <br />ASho ift• <br />Jamie i... <br />PC-024 Temporary Power Date question Closed LLC Gibson -Lewis, Palmer. Brian [Gipson -Lewis. LLC} Gardner, Josh Rochelle.,. OBl23=23 Springer 08f3012023 08123l23 <br />Springer, <br />Josh IG... <br />Josh Springer Sent Wed Aug 23. 2023 at 10:55 am EDT <br />Q: Spec 005413-3-03-A-12 indicates -Subcontractors shall provide temporary power and lighting to complete then Scope of work until such time as the electrical contractor has the temporary power and <br />lighting systems fully <br />operational."- Bid Category 15 General Item •7 indicates "Provide necessary temporary power for the entire jabsite- Enough temporary power should be supplied to the project that no entity must have to run anything longer than <br />a 100' power card on the jobshe." What date can we plan on for BC 15 to have the temporary power operational? <br />Josh Springer (Garmung Construction Services • Fort Wayne) Responded Wed Aug 2a. 2023 at 11:1%am EDT <br />A: Plan on Bid Package 15 having temporary lighting in the bu ildmg by 611124 or approximately 7-5 months after breaking ground - <br />Temporary power an the jobsite should be functional by Bid Package 15 by 111124 or approximately 2.5 months after breaking ground. <br />A: Rochelle Gardner JC-H- Garm" & San, Inc. Terre Haute) Responded Wed Aug 23, ZO23 at 10:59 am EDT <br />This isan Operations question as it deals specifically with the project Schedule. <br />PG023 072119 - CEased•Cel! Spray Polyurethane Foam Closed LLC Gibson -Lewis, Palmer, Brian (Gibson -Lewis, LLCDears.} VIVO (M.,, O8R3RJosh 023 Wnger D8130p023 08129R3 <br />Q: Josh 5pri rigor Sent Wed Aug Z3. 2023 at 10:50 am EDT <br />Please provide spec section 072219 - Close&Cell Spray Polyurethane Foam as it is not in the Project Manual. <br />Virgil Deanes (Meticulous Design•Architec tuie. LLC) Responded Mon Aug 28. 202a at 05:50 pm EDT <br />A: Spec Section 072119 - Ctosed•Cell Spray Polyurethane Foam as it is included in the Project Manual as per REV 1-Addendum *1 Aug- 26, 2023. See related attachment- <br />o7 Z119-Foamed-In-Place Insu lation.pd€ <br />PC OZ2 Missing Site design Drawings indicated on Sheet Closed C-H, Garmong Gardner. Rochelle IC.H, Garm V Dears. OW23f20Z3 josh 0800(2023 08(29123 <br />Index & So... & Son, Inc. Terre Hautel Virgil {M... Springer <br />Qi Josh Springer Sent Wed Aug 23, 2023 at 10:36 am EDT <br />There are Missing Site Design Drawings that are indicated on the Sheet Index. Pleaes provide any missing dravnngs. <br />Virgil Deanes (Meticutous Design-Architectvte, LLC) Responded Mon Aug 28. 2023 at 06:14 pm EDT <br />A: All Site Design Drawings -X.X as indicated an sheet index are provided per updated drawings in Addendum # 1 - REV 1, Aug- 28,202 See related attarhment- <br />RFi #PC-022_ Missing Site Design Drawings indicated do Sheet Index-PHG <br />PG021 Spec Section 019214 Commissioning Authority Closed C.H. Garmong Gardner. Rochelle IC.H. GarnI Dears, O9f2312023 Josh 08f30l2023 OBl31f23 <br />Responsibilities & So--- & San, Inc. Term Haute) Virgil [M-.. Spnngcr <br />josh Springer Sent Wed Aug 23. 2023 at 10:z4 am EDT <br />Q: There are several references to Section 019114 Commissioning "khadty ReSpansibilities however this section is missing from the P+njett Manual. PIea6e provide. <br />Af VlrgR Deans (Meticulous Design•Architecane. LLC) Responded Wed Aug 30, 2023 at 04:29 pm EDT <br />Spec Section 019114 Commissioning Authority Responsibilities is indicated In Spec Section 019313 General Coarnlsslneang RegWrements perAddendum ar 1, REV 1- Aug. 28, 2023. <br />C.M. Gamuong Gardner, Rochelle (C.N. Ganmorig Deanes, Josh <br />PC-D20 Roof stairs Closed OBf23fl023 08/30/2023 08I30123 <br />& So... & San, Inc. Terre Haute) Virgil [M.., gong" <br />Page 17 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.