My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:53:14 AM
Creation date
10/24/2023 1:28:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
If a date of commencement of the Work is not selected, then the date of commencement shall be the date of execution of <br />this Amendment. <br />§ A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in <br />the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of <br />commencement of the Work. <br />§ A.2.3 Substantial Completion <br />§ A.2,3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager <br />shall achieve Substantial Completion of the entire Work: <br />(Check one of the fallowing boxes and complete the necessary information) <br />[ ] Not later than ( ) calendar days from the date of commencement of the Work. <br />[X ] By the following date: February 12, 2025 <br />§ A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are <br />to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial <br />Completion of such portions by the following dates: <br />Portion of Work <br />§ A.2.3.3 Intentionally Omitted <br />Substantial Completion Date <br />ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br />§ A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract <br />Documents and the following: <br />§ A.3.1.1 The following Supplementary and other Conditions of the Contract: <br />Document Title <br />Exhibit i - Attached <br />Date <br />§ A.3.1.2 The following Specifications: <br />(Either fist the Specifications here, or refer to an exhibit attached to this Amendment.) <br />Section Title <br />Exhibit 1 - Attached <br />Date <br />§ A.3.1.3 The following Drawings: <br />(Either list the Drawings here, or refer to an exhibit attached to this Amendment.) <br />Number <br />Exhibit 1 - Attached <br />Title <br />§ A.3.1.4 Qther identifying information: Project Specification Section 013566.05 <br />Date <br />§ A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price:(Identify each <br />allowance) <br />Pages <br />Pages <br />Init. AIA Document A133 — 2019 Exhibit A. Copyright C 1991, 2003, 2009, and 2019. All rights reserved. "The American Institute of Architects," "American institute of <br />Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 11:03:34 3 <br />ET on 1311912023 under Order No. 2114460819 which expires on 08114/2024, is not for resale. is licensed for one-time use only, and may only be used in <br />t accordance with the AIA Contract Docu rnentO Terms of Service- To report copyright violations, a -mail docinfo@aiacontracts.00m. <br />User Notes, [2001155955] <br />
The URL can be used to link to this page
Your browser does not support the video tag.