My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment to MLK Dream Center GMP - Finalize GMP – C.H. Garmong & Sons, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:53:14 AM
Creation date
10/24/2023 1:28:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MILK DREAM CENTER <br />GMP Budget Alternates <br />Description <br />Alternates <br />Alternate No. 1— Outdoor Rest room Building <br />Add construction of Outdoor Restroom Building. Base hid to include site utilities <br />$461,061 <br />(electrical conduit, sewerage, and water) to within 5' of the foundation location. <br />Alternate No. 2 — Outdoor Garage Building <br />Add construction of the Outdoor Garage Building and trash enclosure. Base bid to <br />$478,856 <br />include site utilities (electrical conduit, sewerage, and water) to within 5' of the <br />foundation location. <br />Alternate No. 3 — Balcony of Brotherhood Finishes <br />Add pricing for the roof pavers system, see detail on Sheet A-001 - (R3). Spec <br />$125,905 <br />section 07 76 00. The Base Bid will be the roof TPO system, refer to Sheet A160. <br />Alternate No. 4 — Sunshades <br />$84 924 <br />The cost to add sunshades, refer to Drawing A-711. <br />Alternate No. 5 — Spray Ground Equipment <br />Add the Splash/Spray Pad Equipment per Sheets PL100-PL-301. The Base Bid shall <br />include stubbing of electrical conduit. Drainage, and water connection to the splash <br />$466,423 <br />pad. The Base Bid shall provide turf in lieu of Splash Pad Equipment, see note <br />Number (14) and Sheet L1.2. Spec sections include Section 13 1113, Section 1311 <br />18, Section 13 1120, Section 13 1123, Section 13 1124, and Section 13 1146. <br />Alternate No. 6— Kitchen and Concession Equipment <br />Add the Kitchen and Concessions equipment. Sheets A101 architectural plan and <br />equipment layouts Sheets K1004601. The Base Bid shall include all rough -ins to <br />$217,590 <br />make the space ready for final connections of the Kitchen and Concession <br />Equipment. <br />Alternate No. 7 — Solar Panels <br />Add pricing for solar array and distribution panel Sheet A-106A layout, see Section <br />$266,749 <br />263100. <br />Alternate No. 8 — Park Pavilion (Pre -Engineered Building) <br />Add pricing for the Park Pavilion, see Spec 13 34 19 Metal Building Systems. The <br />$190,813 <br />Base Bid shall include all site storm and all other site utility rough -ins. <br />Alternate No. 9 — Park Ninja Warrior Course <br />Base Bid pricing shall include turf, see note Number 14 and Sheet L1.3 (Site <br />$293'600 <br />Improvement Key #5, 41-49). Add pricing for Ninja Warrior Course, see Seets L1.3, <br />Spec Ninja Warrior Course. <br />October 17, 2021 <br />h <br />GARMONG <br />MLK DREAM CENTER & LINDEN AVE STREETSCAPE <br />ALTERNATES <br />1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.