Change Order No 2 - Monroe Circle Demolition Proj No. 123-048 - Green Demolition Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 2 - Monroe Circle Demolition Proj No. 123-048 - Green Demolition Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 1:25:35 PM
Creation date
10/24/2023 1:25:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br /> <br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, PE, Sr. Project Engineer <br /> <br />SUBJECT: Change Order No. 2 - Project No. 123-048 <br />Monroe Circle Demolition <br />DATE: 10/03/2023 <br />Change Order #1 alerted the Board to the presence of asbestos containing material contained <br />within the foundation slabs of each housing unit as they were demolished. Upon removal of the <br />foundation slabs, the Contractor discovered buried construction debris (bricks, concrete, etc.) at <br />approximately half the locations. <br /> <br />In order for the site to be redeveloped in the near future, the debris must be removed from the <br />site and clean backfill brought in. The cost to remedy this unforeseen circumstance is $182,800: <br />-Remove and replace 6093.33 tons of debris with clean fill @ $30 per ton. <br /> <br />The only scope addition to the project was added tree removal at a cost of $5,000. All other <br />added expenses to this project were unforeseen circumstances. <br /> <br />The project remains on track to finish within budget, approximately 6-8 weeks behind the <br />originally anticipated completion date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.