Laserfiche WebLink
CITY OF SOUTH BEND, INDIANA 1 <br />CONTRACTOR'S QUOTE FOR PUBLIC WORK <br />PROJECT NAME: 430 Cottage Grave Ave, TIF Project —Roof Repairs <br />PROJECT NO, 123-062D <br />QUOTES DUE 9 00 A.M. (E.D.T-) on Tuesday1 October 24, 2023 <br />(Must be completed for all quotes. Please type or print) <br />Date: d " R Firm; <br />Address:y_�!� G Vol? rQV-4- <br />City/State/Zip: 50 H^1 k r T� phone Number: s�� <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of <br />430 Cottage Grove Ave. TIF Project — Roof Repairs <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />of South Bend, Department of Public Works <br />and dated 10116/2023 for the sum of (enter the Total Quote as shown on the Proposal) <br />�--+, Sc,v ($ -?-SU[y <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment <br />By <br />(Si nature) <br />r'U <br />(Printed Name of Person Ssgning) <br />The above quote is accepted this <br />Subject to the following conditions: <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President <br />Gary A. Gilot, Member <br />Alexandra Dolz-Lane, Member <br />Version 2/14/2020 <br />ACCEPTANCE <br />day of f 20 <br />Joseph R. Molnar, Vice President <br />Page - 1 <br />Murray L Miller, Member <br />Attest: Theresa Heffner, Clerk <br />Public Works Quute <br />dow <br />