My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Edison WTP Improvements Proj No. 123-067 – United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Edison WTP Improvements Proj No. 123-067 – United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 10:54:12 AM
Creation date
10/10/2023 10:53:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 1 <br />Exhibit C – Compensation Packet RPR-4: Resident Project Representative Services Direct - Labor Costs Times a Factor Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />COMPENSATION PACKET RPR-4: <br />Resident Project Representative – Direct Labor Times a Factor <br /> <br />Article 2 of the Agreement is supplmented to include the following agreement of the parties: <br /> <br />C2.04 Compensation for Resident Project Representative Basic Services – Direct Labor Costs Times a <br />Factor Method of Payment <br /> <br />A. Owner shall pay Engineer for: <br />1. Resident Project Representative Services: For services of Engineer’s Resident Project <br />Representative under Paragraph A1.05.A.2 of Exhibit A of the Agreement, an amount equal <br />to Engineer’s Direct Labor Costs times a factor of for the services of Engineer’s <br />personnel engaged directly in resident Project representation, plus related Reimbursable <br />Expenses and Engineer’s Consultant’s charges, if any. The total compensation under this <br />paragraph is estimated to be $ __________ , based upon full-time RPR services on an <br />eight-hour workday, Monday through Friday, over a day construction schedule. <br />B. Compensation for Reimbursable Expenses: <br />1. For those Reimbursable Expenses that are not accounted for in the compensation for Basic <br />Services under Paragraph C2.01, and are directly related to the provision of Resident Project <br />Representative or Post-Construction Basic Services, Owner shall pay Engineer at the rates <br />set forth in Appendix 1 to this Exhibit C. <br />2. Reimbursable Expenses include the following categories: transportation and subsistence <br />incidental thereto; ; providing and maintaining field office facilities including furnishings <br />and utilities; subsistence and transportation of Resident Project Representative and assistants; <br />toll telephone calls and mobile phone charges; reproduction of reports, Drawings, <br />Specifications, Bidding Documents, and similar Project-related items in addition to those <br />required under Exhibit A. In addition, if authorized in advance by Owner, Reimbursable <br />Expenses will also include expenses incurred for computer time and the use of other highly <br />specialized equipment. <br />3. The amounts payable to Engineer for Reimbursable Expenses, if any, will be those internal <br />expenses related to the Resident Project Representative Basic Services that are actually <br />incurred or allocated by Engineer, plus all invoiced external Reimbursable Expenses <br />allocable to such services, the latter multiplied by a factor of . <br />4. The Reimbursable Expenses Schedule will be adjusted annually (as of ______ ) to reflect <br />equitable changes in the compensation payable to Engineer. <br /> <br /> <br />C. Other Provisions Concerning Payment Under this Paragraph C2.04:
The URL can be used to link to this page
Your browser does not support the video tag.