Laserfiche WebLink
<br /> <br />Page 1 <br />Exhibit C – Compensation Packet BC-5: Basic Services (other than RPR) – Direct Labor Costs Plus Overhead Plus a Fixed Fee <br />Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br /> <br />This is EXHIBIT C, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-5: Basic Services – Direct Labor Costs Plus Overhead Plus a <br />Fixed Fee <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Direct Labor <br />Costs Plus Overhead Plus a Fixed Fee Method of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer’s <br />Resident Project Representative, if any, as follows: <br />1. An amount equal to Engineer’s Direct Labor Costs plus overhead for the services of <br />Engineer’s personnel engaged directly on the Project, plus Reimbursable Expenses <br />estimated to be $__________________, plus Engineer’s Consultant’s charges, if any, <br />estimated to be $__________________, plus a fixed fee of $__________________. <br />2. Engineer’s Reimbursable Expenses Schedule is attached to this Exhibit C as Appendix 1. <br />3. The total compensation for services under Paragraph C2.01 is estimated to be <br />$__________________ based on the following estimated distribution of compensation: <br />a. Study and Report Phase $______________________ <br />b. Preliminary Design Phase $______________________ <br />c. Final Design Phase $______________________ <br />d. Bidding or Negotiating Phase $______________________ <br />e. Construction Phase $______________________ <br />f. Post-Construction Phase $______________________ <br />4. Engineer may alter the distribution of compensation between individual phases of the work <br />noted herein to be consistent with services actually rendered, but shall not exceed the total <br />estimated compensation amount unless approved in writing by Owner. See Paragraph <br />C2.03.C.2 below.