Laserfiche WebLink
<br /> <br />Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br /> <br />This is EXHIBIT C, consisting of pages, referred to <br />in and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum Method <br />of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of Engineer’s <br />Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $96,300 based on the following estimated distribution of <br />compensation: <br />a. Study and Report Phase $96,300 <br />b. Preliminary Design Phase $TBD <br />c. Final Design Phase $TBD <br />d. Bidding and Negotiating Phase $TBD <br />e. Construction Phase $TBD <br />f. Post-Construction Phase $TBD <br />2. Engineer may alter the distribution of compensation between individual phases noted herein <br />to be consistent with services actually rendered, but shall not exceed the total Lump Sum <br />amount unless approved in writing by the Owner. <br />3. The Lump Sum includes compensation for Engineer’s services and services of Engineer’s <br />Consultants, if any. Appropriate amounts have been incorporated in the Lump Sum to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon <br />Engineer’s estimate of the percentage of the total services actually completed during the <br />billing period.