Laserfiche WebLink
<br /> <br />Page 3 <br />(Exhibit B – Owner's Responsibilities) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />authority of Engineer as an attachment to this Exhibit B that is to be mutually agreed upon and made <br />a part of this Agreement before such services begin. <br />O. Attend the pre-bid conference, bid opening, pre-construction conferences, construction progress and <br />other job related meetings, and Substantial Completion and final payment visits to the Project. <br />P. Provide the services of an independent testing laboratory to perform all inspections, tests, and <br />approvals of samples, materials, and equipment required by the Contract Documents, or to evaluate <br />the performance of materials, equipment, and facilities of Owner, prior to their incorporation into <br />the Work with appropriate professional interpretation thereof. <br />Q. Provide Engineer with the findings and reports generated by the entities providing services to Owner <br />pursuant to this paragraph. <br />R. Inform Engineer in writing of any specific requirements of safety or security programs that are <br />applicable to Engineer, as a visitor to the Site. <br />S. Perform or provide the following additional services: <br />1. Clearwell Inspection and Report of Required Rehabilitation <br />2. Arsenic Test Results <br />3. Existing Plan Operation Information, Plans, Tests, Monthly Reports, etc.