My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - 2023 Brick Spot Repair Proj No. 123-057 - Acorn Landscaping
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - 2023 Brick Spot Repair Proj No. 123-057 - Acorn Landscaping
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 12:09:51 PM
Creation date
10/10/2023 10:51:56 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Scott Kreeger, Project Engineer <br />SUBJECT: Change Order 123-057 <br />2022 Brick Spot Repair <br />DATE: September 29, 2022 <br />During the excavation of the brick at the intersection of LaSalle Ave and Scott St, Acorn <br />Landscaping uncovered approximately 40 feet of damaged clay drain pipe connecting to the <br />City's storm sewer infrastructure. The unforeseen conditions were addressed by the <br />replacement of the pipe and catch basin as recommended by Engineering and Sewer <br />Departments. The cost to replace the pipe, structure and installation of a concrete header was <br />$10,948. <br />Please call with your questions (9245). <br />
The URL can be used to link to this page
Your browser does not support the video tag.