Laserfiche WebLink
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Scott Kreeger, Project Engineer <br />SUBJECT: Change Order 123-057 <br />2022 Brick Spot Repair <br />DATE: September 29, 2022 <br />During the excavation of the brick at the intersection of LaSalle Ave and Scott St, Acorn <br />Landscaping uncovered approximately 40 feet of damaged clay drain pipe connecting to the <br />City's storm sewer infrastructure. The unforeseen conditions were addressed by the <br />replacement of the pipe and catch basin as recommended by Engineering and Sewer <br />Departments. The cost to replace the pipe, structure and installation of a concrete header was <br />$10,948. <br />Please call with your questions (9245). <br />