My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Design Change Angela Bldv. Proj No. 122-059 – DLZ Indiana, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Design Change Angela Bldv. Proj No. 122-059 – DLZ Indiana, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:38:01 PM
Creation date
9/26/2023 2:37:59 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated October 25, 2022. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. ___1__ <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />October 25, 2022 <br /> <br />b. <br /> <br />Owner: <br /> <br />City of South Bend Board of Public Works <br /> <br />c. <br /> <br />Engineer: <br /> <br />DLZ Indiana, LLC <br /> <br />d. <br /> <br />Project: <br /> <br />Angela Boulevard Pedestrian Safety Improvments <br /> <br />2. Description of Modifications: <br />a. Engineer performed the modifications to the plans that were Additional Services <br />beyond the original project scope: <br />1) The plans were modified to include milling the existing asphalt pavement 1 ½ <br />inches throughout the project limits along Angela Boulevard between SR 933 and <br />500 feet west of Twyckenham Drive and repaved with HMA surface at a depth of 1 <br />½ inches. <br /> <br />2) Additional curb ramp layouts and detailed spot elevations were developed at the <br />following locations: <br />a) Curb ramp Northeast corner of Angela Blvd. and SR 933. <br />b) 2 Curb ramps at corners of Angela Blvd. and Leeper Ave. <br />c) 2 Curb ramps at corners of Angela Blvd. and St. Joseph St. <br />d) 2 Curb ramps at corners of Angela Blvd. and Foster St. <br />e) 2 Curb ramps at corners of Angela Blvd. and Stanfield St. <br />f) 2 Curb ramps at corners of Angela Blvd. and Pokagon St. <br />g) 2 Curb ramps at corners of Angela Blvd. and St. Louis Blvd. <br /> <br />3) Pickup topography for the 13 additional ramp locations. <br /> <br />4) An additional bid package will be prepared for bidding. Previously released <br />addendums No. 1 through 3 will be incorporated into a revised plans set and <br />updated specifications. Contract schedule will be revised and quantities adjusted <br />for value engineering plan revisions. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.