Laserfiche WebLink
<br /> <br />Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated October 25, 2022. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. ___1__ <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />October 25, 2022 <br /> <br />b. <br /> <br />Owner: <br /> <br />City of South Bend Board of Public Works <br /> <br />c. <br /> <br />Engineer: <br /> <br />DLZ Indiana, LLC <br /> <br />d. <br /> <br />Project: <br /> <br />Angela Boulevard Pedestrian Safety Improvments <br /> <br />2. Description of Modifications: <br />a. Engineer performed the modifications to the plans that were Additional Services <br />beyond the original project scope: <br />1) The plans were modified to include milling the existing asphalt pavement 1 ½ <br />inches throughout the project limits along Angela Boulevard between SR 933 and <br />500 feet west of Twyckenham Drive and repaved with HMA surface at a depth of 1 <br />½ inches. <br /> <br />2) Additional curb ramp layouts and detailed spot elevations were developed at the <br />following locations: <br />a) Curb ramp Northeast corner of Angela Blvd. and SR 933. <br />b) 2 Curb ramps at corners of Angela Blvd. and Leeper Ave. <br />c) 2 Curb ramps at corners of Angela Blvd. and St. Joseph St. <br />d) 2 Curb ramps at corners of Angela Blvd. and Foster St. <br />e) 2 Curb ramps at corners of Angela Blvd. and Stanfield St. <br />f) 2 Curb ramps at corners of Angela Blvd. and Pokagon St. <br />g) 2 Curb ramps at corners of Angela Blvd. and St. Louis Blvd. <br /> <br />3) Pickup topography for the 13 additional ramp locations. <br /> <br />4) An additional bid package will be prepared for bidding. Previously released <br />addendums No. 1 through 3 will be incorporated into a revised plans set and <br />updated specifications. Contract schedule will be revised and quantities adjusted <br />for value engineering plan revisions. <br /> <br /> <br />