My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Monroe Circle Demolition Proj No. 123-048 - Green Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - Monroe Circle Demolition Proj No. 123-048 - Green Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:36:09 PM
Creation date
9/26/2023 2:36:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend Project No. 123-048 9/26/2023 <br />Monroe Circle Demolition <br />Line Item Qty Unit Price Total <br />Remove Hazardous Foundation Slabs 1 LS $450,000.00 $450,000.00 <br />Remove 3 Trees 1 LS $5,000.00 $5,000.00 <br />CO Total =$455,000.00 <br />Change Order #1 <br />Notes <br />Unforeseen: Existing slabs contain conduit with asbestos; cannot be <br />separated. Entire slab needs to be treated as hazardous. 90,000 cubic <br />feet at $5 per cubic foot. <br />Scope: Existing trees in poor condition; require removal.
The URL can be used to link to this page
Your browser does not support the video tag.