My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. Acceptable Manufacturers <br />a. 3M <br />b. Hilti <br />c. Thunderline <br />d. Or approved equal <br />B. For plastic pipe penetrating fire rated walls, ceilings or floors provide intumescent fire <br />stop and appurtenances installed in accordance with UL requirements. <br />1. Acceptable Manufacturers <br />a. 3-M <br />b. Hilti <br />c. Thunderline <br />d. or approved equal <br />PART 3: EXECUTION <br />3.1 CLEANING AND ADJUSTING <br />A. Clean and adjust all work at completion of project. Where required, coordinate cleaning <br />schedule with other Trades. Protect work as required. <br />B. Clean and flush all piping systems and verify that all plumbing traps, fixtures and floor <br />drains are clean and clear. Disinfect potable water systems as specified hereinafter. <br />Clean construction dust, metal cuttings, grease and other debris from plenums, coils and <br />other related equipment. Pay particular attention to cleaning (and polishing where <br />applicable) of exposed equipment, pipes and ductwork in finished areas. <br />3.2 COORDINATION <br />A. Coordinate routing of piping and ductwork prior to starting installation. <br />3.3 CUTTING AND PATCHING <br />A. Lay out work carefully in advance, and where cutting channeling, chasing or drilling of <br />floors, walls, partitions, ceilings or other surfaces is necessary for the proper installation, <br />support, or anchorage of mechanical equipment, the work is to be carefully done and any <br />damage to the building, piping, or equipment repaired by skilled mechanics of the trades <br />involved, at no additional cost to the Owner. <br />B. The Contractor is responsible for cutting and patching. Patching shall match existing <br />conditions. Review any concerns about acceptable patching materials, and patching <br />methods, with General Contractor and Engineer, as required. Minimize cutting and <br />damage to surrounding materials as much as possible. Throughout the building the <br />Contractor shall carefully verify existing structural conditions, and shall avoid damage to <br />structural building elements. <br />15050 - 2
The URL can be used to link to this page
Your browser does not support the video tag.