My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Quote Number:Quote By:Garrett McBride <br />Quote Date:Contact Email:garrettmcbride@dadodd.com <br />Customer Name: Customer Site Address: <br />Customer Contact: <br />Customer Contact PH: <br />Customer E-mail: <br />Job Description: <br />Replace softener system at Century Center. Provide labor and materials as per RFQ. <br />Turn off power supply to existing softener system. Isolate softeners from piping system. <br />Demo piping as required. Remove existing softener system. Set new softener system. <br />Install new piping as required to softener system and re-use items noted in quote package. <br />Install support structures and secure piping as needed. Insulate new piping as required. <br />Electrical modifications as needed for new softener system. <br />Start-up and programming of new softener system. <br />Special Exceptions/Lead Times: <br />If quote is acceptable please sign and return to garrettmcbride@dadodd.com or fax to 574-968-0590. <br />Signature of Acceptance: Date of Acceptance: <br />Accepted By: Customer PO#: <br />Terms: Net thirty (30) days from invoice completion date. Accounts over thirty (30) days are subject to 1-1/2 % per month <br />finance charge, 18% APR. Accounts over sixty (60) days are subject to mechanics lien. <br />D.A. Dodd, LLC agrees to provide labor and materials in the most timely manner allowable based upon agreed time frame and <br />available materials with exceptions for occurences beyond the control of D.A. Dodd, LLC. <br />All work to be performed during normal business ours between 7am and 4pm unless otherwise agreed upon. <br />Quote is valid for 10 (ten) days from date of this quote. <br />Labor: $8,600.00 <br />Materials: $54,856.40 <br />Sub-Contractors: $6,243.60 <br />psherman@southbendin.gov <br />DA Dodd proposes to provide labor and materials to perform the above described job. <br />DA Dodd proposes to perform the above described job at the quoted price of : <br />$69,700.00 <br />(Sixty-Nine Thousand Seven Hundred dollars) <br />GM23-210 <br />9/26/2023 <br />City of South Bend <br />Patrick Sherman Century Center574-235-5601 <br />Mechanical | Plumbing | Sheet Metal <br />14 E. Michigan Street, Rolling Prairie IN 46371 <br />3416 Rascal Drive, Lafayette IN 47909 2516 N. Home Street, Mishawaka IN 46545
The URL can be used to link to this page
Your browser does not support the video tag.