My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Century Center Water Softener Replacement © Copyright, M/E Design Services <br />South Bend, Indiana September 5, 2023 <br /> <br />PROJECT MEETINGS 01200-1 <br /> <br />SECTION 01200 PROJECT MEETINGS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 DESCRIPTION <br /> <br />A. Work included: To enable orderly review during progress of the Work, and to provide <br />for systematic discussion of problems, the Contractor, in conjunction with the Engineer, <br />will conduct project meetings when required for coordination or to review work progress. <br /> The Contractor shall be responsible to schedule meetings. <br /> <br />B. Related Work: <br /> <br />1. The Contractor's relations with his subcontractors and materials suppliers, and <br />discussions relative thereto, are the Contractor's responsibility and normally are <br />not part of project meetings content. <br /> <br />1.2 SUBMITTALS <br /> <br />A. Minutes: <br /> <br />1. Meeting minutes will be prepared by the Owner's Representative. The <br />Contractor shall review and respond immediately, in writing, to any <br />discrepancies or errors in the meeting minutes. If a response is not received by <br />the Owner's Representative within five (5) days after issuance of minutes the <br />minutes will be assumed to be accurate as written. <br /> <br />1.3 QUALITY ASSURANCE <br /> <br />A. For those persons designated by the Contractor to attend and participate in project <br />meetings, provide required authority to commit the Contractor to solutions agreed upon <br />in the project meetings. <br /> <br />1.4 PRECONSTRUCTION CONFERENCE <br /> <br />A. Schedule a preconstruction conference before starting construction, at a time convenient <br />to Owner and Engineer. Hold the conference at Project site or another convenient <br />location. Conduct the meeting to review responsibilities and personnel assignments. <br /> <br />B. Agenda: Discuss items of significance that could affect progress, including the <br />following: <br />1. Tentative construction schedule. <br />2. Critical work sequencing. <br />3. Designation of responsible personnel, phone lists, contacts. <br />4. Submittal procedures. <br />5. Preparation of Record Documents.
The URL can be used to link to this page
Your browser does not support the video tag.