My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes- Century Center Water Softener System - DA Dodd
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes- Century Center Water Softener System - DA Dodd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 2:34:00 PM
Creation date
9/26/2023 2:33:40 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Century Center Water Softener Replacement © Copyright, M/E Design Services <br />South Bend, Indiana September 5, 2023 <br /> <br /> <br />COORDINATION OF EXISTING CONDITIONS 01040-1 <br />SECTION 01040 COORDINATION OF EXISTING CONDITIONS <br /> <br />PART 1 - GENERAL <br /> <br />1.1 SCOPE <br /> <br />A. The condition of the site, buildings and surroundings shall be accepted as found. Responsibility for <br />conditions are solely the responsibility of the Contractor. <br /> <br />B. Prior to the various work items, the Contractor shall hold a meeting to work out proper locations <br />and pathways, to avoid conflicts and maintain clearances. Include all interested and affected <br />parties, and the Owner/Engineer Representatives. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 not used. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 PROTECTION OF LIFE AND PROPERTY <br /> <br />A. Maintain safe and orderly job conditions. Protect any areas to remain. Maintain required exits. <br />Provide fire extinguishers in the work area. Provide lighting and signage as required. <br /> <br />B. Work practices and job conditions shall meet all State, Federal and Local requirements to protect <br />life and property. <br /> <br />3.1 COORDINATION AND PROCEDURES <br /> <br />A. Verify work to be performed before proceeding. Work to remain shall be protected and if damaged <br />shall be restored to like new condition. Coordinate demolition with other trades as required. Items <br />indicated for demolition shall be completely removed, hauled off-site and disposed of properly at <br />no additional cost to the Owner. <br /> <br />END OF SECTION 01040
The URL can be used to link to this page
Your browser does not support the video tag.