My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Liberty Tower TIF Project Proj No. 123-054 -Trisco System, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Bids
>
Opening of Bids - Liberty Tower TIF Project Proj No. 123-054 -Trisco System, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 8:42:25 AM
Creation date
9/26/2023 2:32:17 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/26/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
fir:,?Fp�1 <br />SYSTEMS, INC. <br />.Sj�AP l 36 <br />LIBERTY TOWER TIF PROJECT — PARKING GARAGE <br />CITY OF SOUTH BEND, INDIANA <br />PROJECT NO. 123-054 <br />Contractor's Bid For Public Work <br />II. Prequalified Bidder Checklist <br />(b) Attachments <br />(i) See attached State of Indiana Certificate of Existence. <br />(ii) Trisco Systems, Inc. has been in business under the same name for 87 years. <br />(iii) There have been no such violations within the preceding five (5) years. <br />(iv) Trisco operates about 16 crews and at this time we have at least 4 crews that are <br />available for a fall start date. If this project begins in the spring we will have most all <br />crews available. The typical crew size is 5-7 workers, and for a project like this we may <br />utilize a crew of closer to 7-10 personnel depending on the efficiency and availability of <br />the work. We usually have over 100 employees at the peak of the season. <br />Regarding project control, Trisco operates under a cross -functional matrix structure, <br />whereby the project team consists of personnel who belong to different managerial <br />departments. This structure allows us to control quality and consistency across all of our <br />projects. The balance of involvement will shift as needed throughout the project. <br />Our current workload ("backlog") is on target with where we like to be at this point in the <br />season. It is not excessive and therefore leaves plenty of availability and capacity for <br />securing new projects such as this. We need to secure several projects each year in the <br />$500,000 - $1 M range and this project is a perfect candidate. We have manpower <br />prepared and are eager to begin work as soon as weather permits. We have the <br />financial capacity and bonding capacity to support this project as well. <br />(v) All employees for this project will be employed by Trisco Systems, Inc. or affiliate <br />Companies. Some work may be subcontracted (surface preparation, security cameras, <br />etc.) and those individuals will also comply with applicable state and federal laws and <br />local ordinances. <br />(vi) Trisco Systems, Inc. is signatory to the International Union of Bricklayers and Allied <br />Craftworkers, and therefore all technicians have been through apprenticeship and <br />training programs through the Union. All supervisors on this project will have OSHA 30- <br />hour training and all technicians will have a minimum of OSHA 10-hour training. <br />a <br />iyyment <br />Sealant, Waterproofing & Restoration Institute <br />2000 8aty Road, Lima, OH 45807 n <br />Phone:419-339-3906 Fax:419-339-3081 <br />office@triscosystems.com www.triscosystems.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.