Laserfiche WebLink
<br />Page 1 <br />(Exhibit C – Compensation Decision Guide) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />1. Compensation for Basic Services (not including Resident Project Representative) (as described in Exhibit A, Part I) <br /> <br /> Decision Question: Which method of compensation is to be used? <br /> <br /> Lump <br />Sum <br />Standard Hourly <br />Rates <br />Percentage of <br />Construction <br />Costs <br />Direct Labor <br />Costs Times a <br />Factor <br />Direct Labor <br />Costs Plus <br />Overhead Plus a <br />Fixed Fee <br />Salary Costs <br />Times a Factor <br />Use This Base <br />Compensation <br />Packet <br />Packet <br />BC-1 Packet BC-2 Packet BC-3 Packet BC-4 Packet BC-5 Packet BC-6 <br />Include This <br />Appendix N/A Appendices 1 and 2 N/A Appendix 1 Appendix 1 Appendix 1 <br /> <br />2. Compensation for Resident Project Representative (as described in Exhibit A, Paragraph A1.05.A.2, and in Exhibit D) <br /> <br /> Decision Question: Which method of compensation is to be used? <br /> <br /> <br />Lump Sum Standard Hourly <br />Rates <br />Percentage of <br />Construction <br />Costs <br />Direct Labor Costs <br />Times a Factor <br />Salary Costs Times a <br />Factor <br />Use This RPR <br />Compensation <br />Packet <br />Packet RPR-1 Packet RPR-2 Packet RPR-3 Packet RPR-4 Packet RPR-5 <br />Include This <br />Appendix N/A Appendices 1 <br />and 2 N/A Appendix 1 Appendix 1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> COMPENSATION DECISION GUIDE FOR USE WITH EXHIBIT C TO EJCDC E-500, 2008 EDITION Compensation Decision Guide for Use with Exhibit C to EJCDC E-500, 2008 Edition Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved.