My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Trail to Connect DTSB to ND Proj No. 122-040 – Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Trail to Connect DTSB to ND Proj No. 122-040 – Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 9:26:50 AM
Creation date
9/13/2023 9:26:19 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLIENT: 315 W. Jefferson Blvd. PROJECT: South Bend, IN 46601SHEET 4 of 5Total Total Principal PM - PE Proj. Engr-PE Staff Engr CAD Tech Land. Arch. Hours CostConcept DesignInitial Field Check with City Staff 4 4 8Alignment 4 6 16 12 38Geometric Layout 4 16 40 40 8 108Prepare Drawings and Exhibits 2 8 16 40 66Weekly Team Progress Meetings 2 2 2 2 2 10Submit and Review with City Staff 4 6 8 4 2230% PlansCover Sheet 1 2 3Sheet Set up and Survey Information on Plans 2 12 50 64Develop Typical Sections 2 6 16 24Geometric Tie Up Sheet 2 6 12 20Set Preliminary Grades 6 20 8 34Establish Prelim Water Main 2 12 12 26Preliminary Drainage 4 28 12 44Intersection Layout and Enhancements 4 8 16 12 40Preliminary Cross Sections 8 32 4030% Cost Estimate 2 8 8 18Weekly Team Progress Meetings 3 3 3 3 3 15QA/QC 4 8 8 8 2830% Submittal and Review with City Staff 4 6 8 4 2260% PlansTypical Sections 4 8 12Maintenance of Traffic 2 8 12 16 38Establish Profile 2 8 4 14Water Main 2 8 12 22Storm Water Drainage 4 16 12 32Intersection Layout and Enhancements 2 4 8 12 12 38Approach Grading 2 4 8 14Intersection Grading 4 6 12 22Preliminary Landscape Plan 4 4 24 16 48Preliminary Lighting Plan 2 4 12 4 22Preliminary Signage and Striping 4 8 12 24Cross Sections 8 8 1660% Specifications 4 8 32 4460% Cost Estimate 2 8 8 18Weekly Team Progress Meetings 3 3 3 3 3 15QA/QC 4 8 8 8 2860% Submittal and Review with City Staff 4 6 8 4 22Project Coordination and MeetingsCoordination with Stakeholders 1 4 12 4 21Public Meetings 4 8 16 8 36Utility CoordinationPreliminary Notification and Correspondence 1 4 5Identificatin of Utilities 4 16 8 28Verification of Utilities 4 8 4 16Conflict Analysis 2 8 24 8 42Utility Work Plan 2 4 12 18PermittingGeneral Stormwater Construction Permit 2 6 36 44Total Hours 9 68 201 475 448 68 1269Cost per Hour $275.00 $195.00 $125.00 $100.00 $95.00 $135.00Total Cost by Classification $2,475.00 $13,260.00 $25,125.00 $47,500.00 $42,560.00 $9,180.00 $140,100.00Geotechnical Investigation $18,000.00Potholing $20,000.00Preliminary Design Total $178,100.00Budget $178,100.00June 28, 2023DESCRIPTIONSTAFFHOURS BY CLASSIFICATIONAPPENDIX "A-1"PRELIMINARY DESIGN - PHASE IStaffhour JustifcationAbonmarche Consultants, Inc. City of South BendNotre Dame to Downtown South Bend Trail
The URL can be used to link to this page
Your browser does not support the video tag.