My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Trail to Connect DTSB to ND Proj No. 122-040 – Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Trail to Connect DTSB to ND Proj No. 122-040 – Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 9:26:50 AM
Creation date
9/13/2023 9:26:19 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
9/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLIENT: 315 W. Jefferson Blvd. PROJECT: South Bend, IN 46601SHEET 2 of 5Total Total Principal PM - PE Proj. Engr-PE Staff Engr CAD Tech Land. Arch. Hours CostConcept DesignInitial Field Check with City Staff 4 4 8Alignment 4 8 24 16 52Geometric Layout 4 24 60 60 8 156Prepare Drawings and Exhibits 2 8 16 60 86Weekly Team Progress Meetings 2 2 2 2 2 10Submit and Review with City Staff 4 6 8 4 2230% PlansCover Sheet 1 2 3Sheet Set up and Survey Information on Plans 2 16 60 78Develop Typical Sections 2 8 24 34Geometric Tie Up Sheet 2 8 16 26Set Preliminary Grades 6 24 16 46Establish Prelim Water Main 2 12 12 26Preliminary Drainage 4 32 24 60Intersection Layout and Enhancements 4 8 16 16 44Preliminary Cross Sections 8 40 4830% Cost Estimate 2 8 8 18Weekly Team Progress Meetings 3 3 3 3 3 15QA/QC 4 8 8 8 2830% Submittal and Review with City Staff 4 6 8 4 2260% PlansTypical Sections 4 8 12Maintenance of Traffic 2 8 16 16 42Establish Profile 2 8 4 14Water Main 2 8 12 22Storm Water Drainage 4 16 12 32Intersection Layout and Enhancements 2 4 8 16 12 42Approach Grading 2 8 8 18Intersection Grading 2 8 32 24 66Preliminary Landscape Plan 4 4 24 16 48Preliminary Lighting Plan 2 4 24 4 34Preliminary Signage and Striping 4 12 16 32Cross Sections 8 8 1660% Specifications 4 8 32 4460% Cost Estimate 2 8 8 18Weekly Team Progress Meetings 3 3 3 3 3 15QA/QC 4 8 8 8 2860% Submittal and Review with City Staff 4 6 8 4 22Project Coordination and MeetingsCoordination with Stakeholders 1 4 12 4 21Public Meetings 4 8 16 8 36Utility CoordinationPreliminary Notification and Correspondence 1 4 5Identificatin of Utilities 4 16 8 28Verification of Utilities 4 8 4 16Conflict Analysis 2 8 24 8 42Utility Work Plan 2 4 12 18PermittingGeneral Stormwater Construction Permit 2 6 40 48Total Hours 9 70 215 561 574 72 1501Cost per Hour $275.00 $195.00 $125.00 $100.00 $95.00 $135.00Total Cost by Classification $2,475.00 $13,650.00 $26,875.00 $56,100.00 $54,530.00 $9,720.00 $163,350.00Geotechnical Investigation $18,000.00Potholing $20,000.00Preliminary Design Total $201,350.00Budget $201,400.00APPENDIX "A-1"PRELIMINARY DESIGN - PHASE IIStaffhour JustifcationDESCRIPTIONSTAFFHOURS BY CLASSIFICATIONNotre Dame to Downtown South Bend TrailJune 28, 2023Abonmarche Consultants, Inc. City of South Bend
The URL can be used to link to this page
Your browser does not support the video tag.