Laserfiche WebLink
<br /> <br />Page 1 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT A, consisting of 12 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br />Engineer’s Services <br /> <br />Article 1 of the Agreement is supplemented to include the following agreement of the parties. <br /> <br />Engineer shall provide Basic and Additional Services as set forth below. <br /> <br />PART 1 – BASIC SERVICES <br />A1.01 Study and Report Phase <br />A. Engineer shall: <br />1. Consult with Owner to define and clarify Owner’s requirements for the Project and <br />available data. <br />2. Advise Owner of any need for Owner to provide data or services of the types described in <br />Exhibit B which are not part of Engineer’s Basic Services. <br />3. Identify, consult with, and analyze requirements of governmental authorities having <br />jurisdiction to approve the portions of the Project designed or specified by Engineer, <br />including but not limited to mitigating measures identified in the environmental <br />assessment. <br />4. Identify and evaluate 1 alternate solutions available to Owner and, after consultation with <br />Owner, recommend to Owner those solutions which in Engineer’s judgment meet Owner’s <br />requirements for the Project. <br />5. Prepare a report drawings (the “Report”) which will, as appropriate, contain schematic <br />layouts, sketches, and conceptual design criteria with appropriate exhibits to indicate the <br />agreed-to requirements, considerations involved, and those alternate solutions available to <br />Owner which Engineer recommends. For each recommended solution Engineer will <br />provide the following, which will be separately itemized: opinion of probable Construction <br />Cost; proposed allowances for contingencies; the estimated total costs of design, <br />professional, and related services to be provided by Engineer and its Consultants; and, on <br />the basis of information furnished by Owner, a summary of allowances for other items and <br />services included within the definition of Total Project Costs. <br />6. Perform or provide the following additional Study and Report Phase tasks or deliverables: <br />None <br />7. Furnish 1 review copies of the Report and any other deliverables to Owner within 60 <br />calendar days of the Effective Date and review it with Owner. Within 10 calendar days <br />of receipt, Owner shall submit to Engineer any comments regarding the Report and any <br />other deliverables.