Laserfiche WebLink
<br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br /> <br /> <br />TO: Board of Public Works <br />Theresa Heffner, Clerk <br />FROM: Leslie Biek, P.E., Assistant City Engineer <br />SUBJECT: PSA for DTSB to ND Trail <br />122-040; PROJ 451; PR 27103 <br />DATE: 9/12/2023 <br />The attached PSA is for Abonmarche to do design a trail that will connect downtown South Bend <br />to Notre Dame. The trail will be placed on Notre Dame Ave from Angela Blvd to South Bend Ave, <br />then continue on South Bend Ave to Hill St and then head south on Hill Street to connect to the <br />LaSalle Streetscape project where a trail is planned to head into downtown. <br /> <br />The project will be bid into 2 bids but will be constructed at the same time. The plan is to have bid <br />documents ready early spring for construction in 2024. <br /> <br />It is requested the Board of Public Works approve of the PSA with Abonmarche Consultants <br />Inc for the design of the DTSB to ND trail (PN 122-040) in the amount of $621,600. <br /> <br />Thank you for your consideration of this request. <br /> <br />