My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rejection of Quote - Lexington & Darden Hydrant Installation Proj No. 122-053
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Reject Bids/Quotes/Proposals
>
Rejection of Quote - Lexington & Darden Hydrant Installation Proj No. 122-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2023 9:23:05 AM
Creation date
9/13/2023 9:23:02 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER-OFFICE MEMORANDUM <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Becca Plantz, Project Engineer <br />SUBJECT: Reject Project No. 122-053 <br />Lexington & Darden Hydrant Installation <br />DATE: August 24, 2023 <br />On August 22, 2023, the Board of Public Works opened and read quotes for the above project. I <br />have reviewed them and found them correct. <br />The quoters ranked as follows: <br />Quoter Total <br />Quote <br />1.HRP Construction, Inc.$398,000 <br />The Division of Engineering has reviewed the quote and recommends that the Board reject the <br />quote due to it being overbudget and exceeding the $150,000 quote limit by statute IC 36-1-12- <br />4.7 Sec. 4.7 (a). <br />Please call with your questions (5998). <br />Enc. Quote Tabulation <br />September 12, 2023
The URL can be used to link to this page
Your browser does not support the video tag.