My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Boehm Park Pavilion Post Footings - A-1 Concrete Leveling
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Quotations & Proposals
>
Award Quote - Boehm Park Pavilion Post Footings - A-1 Concrete Leveling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 2:25:11 PM
Creation date
9/13/2023 9:22:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A,ul" <br />CONCRETE <br />LEVELING <br />wary Location <br />A-1 Concrete Leveling, South Bend <br />25743 State Road 119, Goshen, IN 46526 <br />(574) 862 3146 <br />a south bend a-amail.com <br />www.a1 concretemichiana.com <br />South Bend Parks, South Bend Parks <br />1600 Edison Rd <br />South Bend, IN 46617 <br />Phone: 574-575-2690 <br />Work Bate: 8117/2023 Tachniclan(s): <br />Contact. Brad Ennis Email <br />Estimate <br />E T 23265 <br />aennis@southbendin.gov <br />Description n Price ^:.:roun0 <br />Cut 6, 4'x4' holes in existing concrete slab(per drawing), remove concrete and $9,600.00 1.00 $9,600.00 <br />dig out a 30" diameter x 6' deep hole at all 6 areas as indicated in drawing, <br />prep by placing sonotube and rebar cage in each location and pour cement <br />foundations per drawing. Anchor bolts will be placed in the top of each <br />foundation and top of concrete will be kept 4" lower than top of existing slab. <br />Park owner is responsible to pour concrete to fill 4'x4' cut outs once structure <br />is erected. A-1 Concrete Leveling will install PVC conduit in one foundation <br />and will run it under concrete from outside edge of slab <br />Subtotal $9,600.00 <br />Tax $0.00 <br />Total $9,600.00 <br />otos: <br />1 of 2 This document is a work order receipt. An invoice will follow. <br />
The URL can be used to link to this page
Your browser does not support the video tag.