BIDIPROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: YSBISouth Bend Thrive Subdivision Infrastructure Improvements
<br />Project Number: 123-011
<br />For Bids Due: September 12, 2023
<br />Contractor Name: Se[ a Construction Co., Inc.
<br />BASE BID
<br />Addendum #1
<br />INo.
<br />Description
<br />Quantity �Unit
<br />Unit Price Total Amount
<br />$ 1,625.00 i $ 81,250.00
<br />$ 7,700.00 $ 7,700.00
<br />57
<br />Water Service, Copper, 1 Inch
<br />50 1 EA
<br />58
<br />Connection to Existing Water Main, 6
<br />1
<br />LSUM
<br />Inch Sorin Street
<br />$ 3,250.00 $ 3,250.00
<br />59
<br />Connection to Existing Water Main, 6
<br />1
<br />LSUM
<br />Inch Private
<br />60
<br />Connection to Existing Water Main, 6
<br />1
<br />LSUM
<br />$ 3,250.00 $ 3,250.00
<br />Inch McKinel Avenue)
<br />61
<br />Connection to Existing Water Main, 8
<br />1
<br />LSUM
<br />$ 3,250.00 $ 3,250.00
<br />Inch McKinle Avenue)
<br />62
<br />Underground Stormwater System
<br />1
<br />LSUM
<br />$ 615,250.00_1 $ 615,250.00
<br />:$ 9,800.00 $ 9,800.00
<br />63
<br />Tesco Cabinet and Foundation
<br />1
<br />EA
<br />64
<br />Conduit, HDPE, 3 Inch (Lighting)
<br />695
<br />LFT
<br />$ 14.00
<br />6 8,330.00
<br />65
<br />Conduit, HDPE, 2 Inch (Lighting)
<br />4270
<br />LFT
<br />$ 11.65
<br />$ 49,745.50
<br />66
<br />Handhole (Lighting)
<br />7
<br />EA
<br />$ 800.00
<br />$ 5,600.00
<br />67
<br />Electrical Wiring (Lighting)
<br />4270
<br />LFT
<br />$ 14.00
<br />$ 59,780.00
<br />68
<br />Light Pole Assembly and Foundation
<br />46
<br />EA
<br />;$ 7,000.00
<br />$ 322,000.00
<br />69
<br />Pavement Marking, 6 Inch White
<br />575
<br />LFT
<br />$ 5.60
<br />$ 3,220.00
<br />Crosswalk Line
<br />$ 741.00
<br />70
<br />Pavement Marking, 24 Inch White Stop
<br />57
<br />LFT
<br />$13.00
<br />Bar
<br />71
<br />Sign, STOP, and Post
<br />10
<br />EA
<br />$ 290.00
<br />$ 2,900.00
<br />72
<br />Sign, ADA Parking, and Post
<br />1
<br />EA
<br />$ 270.00
<br />$ 270.00
<br />73
<br />Sign, Street Identification
<br />10
<br />EA
<br />$ 120.00
<br />$ 1,200.00
<br />74
<br />Maintain Wastewater Service (Allowance)
<br />1
<br />EA
<br />$15,000.00
<br />$15,000.0
<br />75
<br />Provide Light Pole Assembly
<br />4
<br />EA
<br />$ 5,800.00
<br />$ 23,200.00
<br />MA^t MIMT^TA1 _ 3.788.359.51
<br />UIIJ 1 V I f1V
<br />ALTERNATE #1 —TELECOMMUNICATIONS
<br />Item
<br />l Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />No.
<br />All
<br />Conduit, HDPE, 3 Inch
<br />1965
<br />LFT
<br />$14.50
<br />$ 28,492.50
<br />Telecommunications
<br />Al2
<br />Handhole (Telecommunications)
<br />5
<br />EA
<br />900.00
<br />$ 4,500.00
<br />ALTERNATE #1 TOTAL $ 32, 992.50 _
<br />Version 09/29/2021 Contractor's Bid for Public Works - 9