Laserfiche WebLink
Q4SpL1TH D� . <br />BIDIPROPOSAL PeTeE 5; <br />CITY OF SOUTH BEND°'' <br />Project Name: YSB/South Bend Thrive Subdivision Infrastructure Improvements 186=` <br />Project Number: 123-011 <br />For Bids Due: September 12, 2023 <br />Contractor Name: Selge Construction CO., Inc. <br />BASE BID <br />Addendum #1 <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Maintenance of Traffic <br />1 <br />LSUM <br />$ 37,500.00 <br />$ 37,500.00 <br />2 <br />Construction Engineering and Staking <br />1 <br />LSUM <br />$ 45,000.00 <br />$ 45,000.00 <br />3 <br />Mobilization and Demobilization <br />5% Maximum <br />1 <br />LSUM <br />$ gg 300.00 <br />$ gg 300.00 <br />4 <br />Sediment and Erosion Control <br />1 <br />LSUM <br />$56,000.00 <br />$ 56,000.00 <br />5 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />$ 148,000.00 <br />$ 148,000.00 <br />6 <br />Common Excavation <br />17000 <br />CYS <br />$ g 00 <br />$ 153,000.00 <br />7 <br />Structure Backfill (Undistributed) <br />100 <br />CYS <br />$ 25.00 <br />$ 2,500.00 <br />8 <br />Catch Basin / Drywell, Remove <br />3 <br />EA <br />$ 250.00 <br />$ 750.00 <br />9 <br />Storm Sewer Pipe, Remove <br />150 <br />LFT <br />$ 15.00 <br />$ 2,250.00 <br />10 <br />Concrete Curb, Remove <br />290 <br />LFT <br />$ 15.00 <br />$ 4,350.00 <br />11 <br />Concrete Approaches and Sidewalk, <br />Remove <br />90 <br />SYD <br />$ 15.00 <br />$ 1,350.00 <br />12 <br />Structure, Strain Poles and Catenary <br />Wire, Remove <br />2 <br />EA <br />$ 1,650.00 <br />$ 3,300.00 <br />13 <br />Structure, Light Poles, Remove <br />2 <br />EA <br />$ 450.00 <br />$ 900.00 <br />14 <br />Structure, Commercial Sign, Remove <br />1 <br />EA <br />$ 5,000.00 <br />$ 5,000.00 <br />15 <br />Structure, Swing Set, Remove <br />1 <br />EA <br />$ 5,000.00 <br />$ 5,000.00 <br />16 <br />Structure, Fence, Remove <br />377 <br />LFT <br />$10.00 <br />$ 3,770.00 <br />17 <br />Structure, Traffic Sign, Remove <br />3 <br />EA <br />$ 125.00 <br />$ 375.00 <br />18 <br />Milling and Removal, Asphalt, Full Depth <br />5745 <br />SYS <br />$ 8.00 <br />$ 45,960.00 <br />19 <br />Milling and Removal, Asphalt, 1-1/2" <br />445 <br />SYS <br />$ 10.00 <br />$ 4,450.00 <br />20 <br />Compacted Aggregate Base, No. 53 <br />1385 <br />CYS <br />$ 65.00 <br />$ 90,025.00 <br />21 <br />HMA Pavement, Base, 880 LBS/SYD <br />195 <br />TONS <br />$ 125.00 <br />$ 24,375.00 <br />22 <br />HMA Pavement, Base, 440 LBS/SYD <br />1425 <br />TONS <br />$ 85.00 <br />$ 121,125.00 <br />23 <br />HMA Pavement, Intermediate, 275 <br />LBS/SYD <br />950 <br />TONS <br />$ 96.00 <br />$ 91,200.00 <br />24 <br />HMA Pavement, Surface, 165 LBS/SYD <br />610 <br />TONS <br />$ 114.00 <br />$ 69,540.00 <br />25 <br />PCCP for Approaches, 9 Inches <br />350 <br />SYD <br />$112.00 <br />$ 39,200.00 <br />26 <br />PCCP for Approaches, 6 Inches <br />150 <br />SYD <br />P 102.50 <br />$ 15,375.00 <br />27 <br />Concrete Curb and Gutter, 6 Inch <br />4515 <br />1 LFT <br />$ 24.00 <br />$ 108,360.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />