Q4SpL1TH D� .
<br />BIDIPROPOSAL PeTeE 5;
<br />CITY OF SOUTH BEND°''
<br />Project Name: YSB/South Bend Thrive Subdivision Infrastructure Improvements 186=`
<br />Project Number: 123-011
<br />For Bids Due: September 12, 2023
<br />Contractor Name: Selge Construction CO., Inc.
<br />BASE BID
<br />Addendum #1
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />Maintenance of Traffic
<br />1
<br />LSUM
<br />$ 37,500.00
<br />$ 37,500.00
<br />2
<br />Construction Engineering and Staking
<br />1
<br />LSUM
<br />$ 45,000.00
<br />$ 45,000.00
<br />3
<br />Mobilization and Demobilization
<br />5% Maximum
<br />1
<br />LSUM
<br />$ gg 300.00
<br />$ gg 300.00
<br />4
<br />Sediment and Erosion Control
<br />1
<br />LSUM
<br />$56,000.00
<br />$ 56,000.00
<br />5
<br />Clearing Right -of -Way
<br />1
<br />LSUM
<br />$ 148,000.00
<br />$ 148,000.00
<br />6
<br />Common Excavation
<br />17000
<br />CYS
<br />$ g 00
<br />$ 153,000.00
<br />7
<br />Structure Backfill (Undistributed)
<br />100
<br />CYS
<br />$ 25.00
<br />$ 2,500.00
<br />8
<br />Catch Basin / Drywell, Remove
<br />3
<br />EA
<br />$ 250.00
<br />$ 750.00
<br />9
<br />Storm Sewer Pipe, Remove
<br />150
<br />LFT
<br />$ 15.00
<br />$ 2,250.00
<br />10
<br />Concrete Curb, Remove
<br />290
<br />LFT
<br />$ 15.00
<br />$ 4,350.00
<br />11
<br />Concrete Approaches and Sidewalk,
<br />Remove
<br />90
<br />SYD
<br />$ 15.00
<br />$ 1,350.00
<br />12
<br />Structure, Strain Poles and Catenary
<br />Wire, Remove
<br />2
<br />EA
<br />$ 1,650.00
<br />$ 3,300.00
<br />13
<br />Structure, Light Poles, Remove
<br />2
<br />EA
<br />$ 450.00
<br />$ 900.00
<br />14
<br />Structure, Commercial Sign, Remove
<br />1
<br />EA
<br />$ 5,000.00
<br />$ 5,000.00
<br />15
<br />Structure, Swing Set, Remove
<br />1
<br />EA
<br />$ 5,000.00
<br />$ 5,000.00
<br />16
<br />Structure, Fence, Remove
<br />377
<br />LFT
<br />$10.00
<br />$ 3,770.00
<br />17
<br />Structure, Traffic Sign, Remove
<br />3
<br />EA
<br />$ 125.00
<br />$ 375.00
<br />18
<br />Milling and Removal, Asphalt, Full Depth
<br />5745
<br />SYS
<br />$ 8.00
<br />$ 45,960.00
<br />19
<br />Milling and Removal, Asphalt, 1-1/2"
<br />445
<br />SYS
<br />$ 10.00
<br />$ 4,450.00
<br />20
<br />Compacted Aggregate Base, No. 53
<br />1385
<br />CYS
<br />$ 65.00
<br />$ 90,025.00
<br />21
<br />HMA Pavement, Base, 880 LBS/SYD
<br />195
<br />TONS
<br />$ 125.00
<br />$ 24,375.00
<br />22
<br />HMA Pavement, Base, 440 LBS/SYD
<br />1425
<br />TONS
<br />$ 85.00
<br />$ 121,125.00
<br />23
<br />HMA Pavement, Intermediate, 275
<br />LBS/SYD
<br />950
<br />TONS
<br />$ 96.00
<br />$ 91,200.00
<br />24
<br />HMA Pavement, Surface, 165 LBS/SYD
<br />610
<br />TONS
<br />$ 114.00
<br />$ 69,540.00
<br />25
<br />PCCP for Approaches, 9 Inches
<br />350
<br />SYD
<br />$112.00
<br />$ 39,200.00
<br />26
<br />PCCP for Approaches, 6 Inches
<br />150
<br />SYD
<br />P 102.50
<br />$ 15,375.00
<br />27
<br />Concrete Curb and Gutter, 6 Inch
<br />4515
<br />1 LFT
<br />$ 24.00
<br />$ 108,360.00
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7