My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Youth Srvs. Bureau & SB Thrive Subdivision Infrastructure - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Bids
>
Opening of Bids - Youth Srvs. Bureau & SB Thrive Subdivision Infrastructure - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 10:15:26 AM
Creation date
9/13/2023 9:14:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Letting Date: September 12, 2023 <br />■ <br />Item: <br />Contract: Thrive Subdivision COSB <br />ENTE PIRISE$ rruc_ <br />Item No. <br />Description <br />Qty <br />Unit Unit Price <br />Ext. <br />3 <br />mob & demob (5% max) <br />1 <br />LS <br />11,200.00 <br />11,200.00 <br />12 <br />structure strain poles & catenary wire remove 2 <br />EA <br />1,650.00 <br />3,300.00 <br />13 <br />structure light poles remove <br />2 <br />EA <br />450.00 <br />900.00 <br />17 <br />structure traffic sign remove <br />3 <br />EA <br />125.00 <br />375.00 <br />63 <br />tesco cabinet & fdn <br />1 <br />EA <br />9,800.00 <br />9,800.00 <br />64 <br />conduit HDPE 3" (lighting) <br />595 <br />LF <br />14.00 <br />8,330.00 <br />65 <br />conduit HDPE 2" (lighting) <br />4270 <br />LF <br />11.65 <br />49,745.50 <br />66 <br />handhole (lighting) <br />7 <br />EA <br />800.00 <br />5,600.00 <br />67 <br />electrical wiring (lighting) <br />4270 <br />LF <br />14.00 <br />59,780.00 <br />68 <br />light pole assembly & fdn <br />46 <br />EA <br />7,000.00 <br />322,000.00 <br />71 <br />sign stop & post <br />10 <br />EA <br />290.00 <br />2,900.00 <br />72 <br />sign ADA parking & post <br />1 <br />EA <br />270.00 <br />270.00 <br />73 <br />sign street identification <br />10 <br />EA <br />120.00 <br />1,200.00 <br />75 <br />provide light pole assembly <br />4 <br />EA <br />5,800.00 <br />23,200.00 <br />Total: <br />$498,600.50 <br />Alternate #1 <br />A11 <br />conduit HDPE 3" (telecommunications) 1965 <br />LF <br />14.50 <br />28,492.50 <br />Al2 <br />handhole (telecommunications) <br />5 <br />EA <br />900.00 <br />4,500.00 <br />Pricing does not include. <br />Layout. <br />Spoil removal. <br />Restoration of any surfaces. <br />Alt #1 Total: <br />Total: <br />$32,992.50 <br />$531,593.00 <br />Certified DBE 8r WBE <br />Sheet 1 of 1 <br />9/11/2023 1:39 PM <br />Hawk Is signatory to IBEW Local 1393 Indiana Local 9 Illinois whose Jurisdiction covers all of its work since 1992. <br />
The URL can be used to link to this page
Your browser does not support the video tag.