Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: YSB/South Bend Thrive Subdivision Infrastructure Improvements <br />Project Number: <br />For Bids Due: <br />123-011 <br />September 12, 2023 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Maintenance of Traffic <br />1 <br />LSUM <br />$35,310.91 <br />$35,310.91 <br />2 <br />Construction Engineering and Staking <br />1 <br />LSUM <br />$58,500.00 <br />$58,500.00 <br />3 <br />Mobilization and Demobilization <br />5% Maximum <br />1 <br />LSUM <br />$42,139.33 <br />$42,139.33 <br />4 <br />Sediment and Erosion Control <br />1 <br />LSUM <br />$2,846.21 <br />$2,846.21 <br />5 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />$54,900.00 <br />$54,900.00 <br />6 <br />Common Excavation <br />17000 <br />CYS <br />$14.91 <br />$253,470.00 <br />7 <br />Structure Backfill (Undistributed) <br />100 <br />CYS <br />$93.80 <br />$9,380.00 <br />8 <br />Catch Basin / Drywell, Remove <br />3 <br />EA <br />$738.23 <br />$2,214.69 <br />9 <br />Storm Sewer Pipe, Remove <br />150 <br />LFT <br />$10.65 <br />$1,597.50 <br />10 <br />Concrete Curb, Remove <br />290 <br />LFT <br />$18.73 <br />$5,431.70 <br />11 <br />Concrete Approaches and Sidewalk, <br />Remove <br />90 <br />SYD <br />$45.27 <br />$4,074.30 <br />12 <br />Structure, Strain Poles and Catenary <br />Wire, Remove <br />2 <br />EACH <br />$1,750.00 <br />$3,500.00 <br />13 <br />Structure, Light Poles, Remove <br />2 <br />EACH <br />$200.00 <br />$400.00 <br />14 <br />Structure, Commercial Sign, Remove <br />1 <br />EACH <br />$19,431.67 <br />$19,431.67 <br />15 <br />Structure, Swing Set, Remove <br />1 <br />EACH <br />$4,073.96 <br />$4,073.96 <br />16 <br />Structure, Fence, Remove <br />377 <br />LFT <br />$50.09 <br />$18,883.93 <br />17 <br />Structure, Traffic Sign, Remove <br />3 <br />EA <br />$30.00 <br />$90.00 <br />18 <br />Milling and Removal, Asphalt, Full Depth <br />5745 <br />SYS <br />$9.47 <br />$54,405.15 <br />19 <br />Milling and Removal, Asphalt, 1-1/2" <br />445 <br />SYS <br />$20.46 <br />$9,104.70 <br />20 <br />Compacted Aggregate Base, No. 53 <br />1385 <br />CYS <br />$61.77 <br />$85,551.45 <br />21 <br />HMA Pavement, Base, 880 LBS/SYD <br />195 <br />TONS <br />$100.00 <br />$19,500.00 <br />22 <br />HMA Pavement, Base, 440 LBS/SYD <br />1425 <br />TONS <br />$87.00 <br />$123,975.00 <br />23 <br />HMA Pavement, Intermediate, 275 <br />LBS/SYD <br />950 <br />TONS <br />$92.00 <br />$87,400.00 <br />24 <br />HMA Pavement, Surface, 165 LBS/SYD <br />610 <br />TONS <br />$119.00 <br />$72,590.00 <br />25 <br />PCCP for Approaches, 9 Inches <br />350 <br />SYD <br />$90.00 <br />$31,500.00 <br />26 <br />PCCP for Approaches, 6 Inches <br />150 <br />SYD <br />$71.50 <br />$10,725.00 <br />27 <br />Concrete Curb and Gutter, 6 Inch <br />4515 <br />LFT <br />$23.50 <br />$106,102.50 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />