Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: YSB/South Bend Thrive Subdivision Infrastructure Improvements <br />Project Number: 123-011 <br />For Bids Due: September 12, 2023 <br />Contractor Name: C & E Excavating Inc <br />BASE BID <br />Addendum #1 <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />1 <br />Maintenance of Traffic <br />1 <br />LSUM <br />$49,800.00 <br />$49,800.00 <br />2 <br />Construction Engineering and Staking <br />1 <br />LSUM <br />$54,500.00 <br />$54,500.00 <br />3 <br />Mobilization and Demobilization <br />1 <br />LSUM <br />$134,560.00 <br />$134,560.00 <br />5% Maximum <br />4 <br />Sediment and Erosion Control <br />1 <br />LSUM <br />$94,000.00 <br />$94,000.00 <br />5 <br />Clearing Right -of -Way <br />1 <br />LSUM <br />$23,960.00 <br />$23,960.00 <br />6 <br />Common Excavation <br />17000 <br />CYS <br />$8.70 <br />$147,900.00 <br />7 <br />Structure Backfill (Undistributed) <br />100 <br />CYS <br />$45.00 <br />$4,500.00 <br />8 <br />Catch Basin I Drywell, Remove <br />3 <br />EA <br />:$319.25 <br />$957.75 <br />9 <br />Storm Sewer Pipe, Remove <br />150 <br />LFT <br />$10.30 <br />$1,545.00 <br />10 <br />Concrete Curb, Remove <br />290 <br />LFT <br />$11.00 <br />$3,190.00 <br />11 <br />Concrete Approaches and Sidewalk, <br />90 <br />SYD <br />$23.50 <br />$2,115.00 <br />Remove <br />Structure, Straln Poles and Catenary <br />2 <br />EA <br />$1,720.00 <br />$3,440.00 <br />12 <br />Wire, Remove <br />13 <br />Structure, Light Poles, Remove <br />2 <br />EA <br />$469.00 <br />$938.00 <br />14 <br />Structure, Commercial Sign, Remove <br />1 <br />EA <br />$2,450.00 <br />$2,450.00 <br />15 <br />Structure, Swing Set, Remove <br />1 <br />EA <br />$4,200.00 <br />$4,200.00 <br />16 <br />Structure, Fence, Remove <br />377 <br />LFT <br />$7.00 <br />$2,639.00 <br />ructure, TrWRemoveemove <br />3 <br />EA <br />$206.00 <br />$618.00 <br />illing and Rphalt, Full Depth <br />5745 <br />SYS <br />$4.30 <br />$24,703.50 <br />illing and Rsphalt, 1-1/2" <br />445 <br />SYS <br />$8.50 <br />$3,782.50 <br />giOCompacted <br />Base, No. 53 <br />1385 <br />CYS <br />$70.25 <br />$97,296.25 <br />MA Pavem880 LBS/SYD <br />195 <br />TONS <br />$113.50 <br />$22,132.50 <br />MA Pavem440 LBSISYD <br />1425 <br />TONS <br />$109.25 <br />$155,681.25 <br />23 <br />HMA Pavement, Intermediate, 275 <br />950 <br />TONS <br />$96.00 <br />$91,200.00 <br />LBS/SYD <br />24 <br />HMA Pavement, Surface, 165 LBSISYD <br />610 <br />TONS <br />$124.00 <br />$75,640.00 <br />25 <br />PCCP for Approaches, 9 Inches <br />350 <br />SYD <br />$89.75 <br />$31,412.50 <br />26 <br />PCCP for Approaches, 6 Inches <br />150 <br />SYD <br />$133.50 <br />$20,025.00 <br />27 <br />Concrete Curb and Gutter, 6 Inch <br />4515 <br />LFT <br />$47.20 <br />$213,108.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />