My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 3 - North Water Treatment Plant Improvements Proj No. 119-011 - Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 12:12:57 PM
Creation date
8/22/2023 2:18:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/22/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
119-011, (15-22-042) South Bend North Filter Project — PCO-06 Unused Allowance + Unit Price Budget <br />1 OF 1 <br />Combined Filter Allowances <br />Unit Price Weld Work Total <br />Internal Components (Hungerford & Terry Material Cost) <br />Internal Components (Bowen Labor Complete) <br />Gravel Retaining Screen Angle Refurbishment <br />Plug Welds <br />Stud and Clip Repairs <br />Pipe Hanger / Manway Weld Outs <br />$ 500,000.00 <br />$ 369,500.00 <br />Notes <br />7/6/2023 <br />$ (305,870.00) <br />Billed under Lump Sum tab. Allowances adjusted and billed out per each <br />filter <br />$ (54,970.00) <br />Billed under Lump Sum tab. Allowances adjusted and billed out per each <br />filter <br />$ (10,000.00) <br />Billed under Lump Sum tab. Allowances adjusted and billed out per each <br />filter <br />$ (51,985.00) <br />Billed under Unit Price tab of the Pay Application per each filter <br />$ (83,135.00) <br />Billed under ASI-2 under the Unit Price Tab of the Pay Application <br />$ (6,112.00) <br />Billed under ASI-3 under the Unit Price Tab of the Pay Application <br />PCO-06 Unused Allowance + Unit Price Budget $ 357,428.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.