Laserfiche WebLink
8802 North Meridian St. • Indianapolis, IN 46260 • 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com <br />PAGE 2 OF 2 <br />Clarifications: <br />- No pressure testing has been included other than an in-service test. <br />- No weld inspection / NDE Testing has been included. <br />- One mobilization has been included. Additional mobilization if required will incur additional costs. <br />- No overtime / premium time has been included. <br />- Pipeline can be isolated for the duration required to complete the scope of work. <br />- Plant personnel will be responsible for isolation of areas as required to complete the scope of work. <br />- Zimmerman is a trusted contractor of the City of South Bend. Therefore, to reduce the cost of the <br />proposal, BEC has eliminated supervision cost to oversee Zimmerman and will not be onsite. <br />- Additional contract time will be required. A revised substantial completion date will be mutually <br />agreed to. <br />Thank you for the opportunity, <br />Mitchell Stull, Senior Project Engineer <br />Mobile: 317-650-8313 | Email: mstull@bowenengineering.com