Laserfiche WebLink
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENGINEERING <br /> <br /> <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Becca Plantz, Project Engineer <br />SUBJECT: Change Order 3 Project No. 119-011 <br />DATE: August 11, 2023 <br /> <br />This contract was originally awarded as an open market contract after being opened first on <br />November 9, 2021. The open market contract was awarded on April 26, 2022, and owner <br />direction was provided to wait until after the summer season to shut the plant down. Additional <br />field orders from the owner and research for discussions to finalize requests for information <br />support the reason for extending the substantial completion to October 31, 2023, or scope <br />complete to the point that the plant can come back on in this time. Field orders and RFIs <br />resulting in delay include replacing manways on each vessel per R-Stamp standards, applying <br />to be removed from the state registered list of vessels prior to repairs, and filter clarifications on <br />pre-conditioned media. The final completion is being set for November 30, 2023, to encompass <br />discharge water head pipe replacement. <br /> <br />The increase of this change order in the amount of $5,687 is a net total of field orders and <br />savings found in the allowances and unit price items. Increased costs are associated with the <br />need to replace the hatches on each vessel, the testing required for this level of replacement, <br />repair and replacement of the degrading discharge head in the upper level, and a support gravel <br />size change during media placement. The physical rehabilitation of the vessels is nearing <br />completion with less structural concerns encountered than prepared for, resulting in savings <br />identified in the allowances and unit prices designed for this scope. <br /> <br />Please call with your questions (5998). <br /> <br /> <br />