Laserfiche WebLink
BID TABULATION <br />2023 Street and Sewer Material Bid <br />Project No: 123-019 <br />For Bids Due: March 28, 2023 <br />10 TOPSOIL AND SEEDING 769 SYS 9.00$ 6,921.00$ 32.00$ 24,608.00$ 38.00$ 29,222.00$ 20.93$ 16,095.17$ 25.20$ 19,378.80$ <br />11 TREE, REMOVE, 30-IN 6 EA 3,350.00$ 20,100.00$ 1,500.00$ 9,000.00$ 1,400.00$ 8,400.00$ 4,612.82$ 27,676.92$ 1,475.00$ 8,850.00$ <br />12 STUMP, REMOVE 2 EA 450.00$ 900.00$ 500.00$ 1,000.00$ 300.00$ 600.00$ 250.00$ 500.00$ 575.00$ 1,150.00$ <br />13 PLANT, DECIDUOUS TREE, SINGLE STEM. 2-IN TO 2.5-IN 12 EA 515.00$ 6,180.00$ 1,000.00$ 12,000.00$ 975.00$ 11,700.00$ 975.00$ 11,700.00$ 975.00$ 11,700.00$ <br />DIVISION C TOTAL 188,913.00$ 246,378.00$ 260,908.00$ 273,320.71$ 301,145.05$ <br />DIVISION D <br />Item No.Description Quantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total <br />1 CONCRETE SIDEWALK, REMOVE 482 SYS 14.00$ 6,748.00$ 45.00$ 21,690.00$ 62.00$ 29,884.00$ 38.24$ 18,431.68$ 83.50$ 40,247.00$ <br />2 CONCRETE SIDEWALK, 4-IN 480 SYS 80.00$ 38,400.00$ 75.00$ 36,000.00$ 95.00$ 45,600.00$ 79.44$ 38,131.20$ 99.65$ 47,832.00$ <br />3 CONCRETE CURB, REMOVE 639 LFT 10.00$ 6,390.00$ 25.00$ 15,975.00$ 24.00$ 15,336.00$ 31.11$ 19,879.29$ 65.35$ 41,758.65$ <br />4 CONCRETE CURB, MODIFIED 639 LFT 56.00$ 35,784.00$ 63.00$ 40,257.00$ 80.00$ 51,120.00$ 50.46$ 32,243.94$ 65.25$ 41,694.75$ <br />5 CONCRETE APPROACH, REMOVE 45 SYS 44.00$ 1,980.00$ 80.00$ 3,600.00$ 100.00$ 4,500.00$ 96.25$ 4,331.25$ 76.00$ 3,420.00$ <br />6 PCCP FOR APPROACHES, 6-IN 34 SYS 116.00$ 3,944.00$ 100.00$ 3,400.00$ 220.00$ 7,480.00$ 106.83$ 3,632.22$ 197.00$ 6,698.00$ <br />7 TOPSOIL AND SEEDING 558 SYS 9.00$ 5,022.00$ 32.00$ 17,856.00$ 45.00$ 25,110.00$ 30.09$ 16,790.22$ 26.45$ 14,759.10$ <br />8 TREE, REMOVE, 18-IN 2 EA 1,800.00$ 3,600.00$ 1,300.00$ 2,600.00$ 1,200.00$ 2,400.00$ 2,912.82$ 5,825.64$ 1,250.00$ 2,500.00$ <br />9 TREE, REMOVE, 30-IN 3 EA 3,350.00$ 10,050.00$ 1,700.00$ 5,100.00$ 1,600.00$ 4,800.00$ 4,612.82$ 13,838.46$ 1,675.00$ 5,025.00$ <br />10 PLANT, DECIDUOUS TREE, SINGLE STEM. 2-IN TO 2.5-IN 10 EA 515.00$ 5,150.00$ 1,100.00$ 11,000.00$ 1,015.00$ 10,150.00$ 1,015.00$ 10,150.00$ 1,015.00$ 10,150.00$ <br />DIVISION D TOTAL 117,068.00$ 157,478.00$ 196,380.00$ 163,253.90$ 214,084.50$ <br />DIVISION E <br />Item No.Description Quantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total Unit Price Item Total <br />1 CONCRETE SIDEWALK, REMOVE 394 SYS 14.00$ 5,516.00$ 45.00$ 17,730.00$ 50.00$ 19,700.00$ 40.86$ 16,098.84$ 79.00$ 31,126.00$ <br />2 CONCRETE SIDEWALK, 4-IN 394 SYS 80.00$ 31,520.00$ 75.00$ 29,550.00$ 85.00$ 33,490.00$ 92.48$ 36,437.12$ 85.00$ 33,490.00$ <br />3 CONCRETE CURB, REMOVE 728 LFT 10.00$ 7,280.00$ 15.00$ 10,935.00$ 23.00$ 16,767.00$ 23.80$ 17,350.20$ 61.10$ 44,541.90$ <br />4 CONCRETE CURB, MODIFIED 728 LFT 56.00$ 40,768.00$ 75.00$ 54,675.00$ 76.00$ 55,404.00$ 66.74$ 48,653.46$ 57.00$ 41,553.00$ <br />5 CONCRETE APPROACH, REMOVE 64 SYS 44.00$ 2,816.00$ 115.00$ 7,245.00$ 110.00$ 6,930.00$ 91.66$ 5,774.58$ 71.50$ 4,504.50$ <br />6 PCCP FOR APPROACHES, 6-IN 64 SYS 116.00$ 7,424.00$ 115.00$ 7,245.00$ 175.00$ 11,025.00$ 96.99$ 6,110.37$ 202.00$ 12,726.00$ <br />7 CONCRETE CURB RAMP, REMOVE 23 SYS 40.00$ 920.00$ 100.00$ 2,300.00$ 135.00$ 3,105.00$ 182.62$ 4,200.26$ 71.50$ 1,644.50$ <br />8 ONE-WAY PERPENDICULAR CURB RAMP 12 SYS 417.00$ 5,004.00$ 250.00$ 3,000.00$ 365.00$ 4,380.00$ 660.93$ 7,931.16$ 257.00$ 3,084.00$ <br />9 PAIRED PERPENDICULAR CURB RAMP 11 SYS 432.00$ 4,752.00$ 250.00$ 2,750.00$ 365.00$ 4,015.00$ 438.54$ 4,823.94$ 287.00$ 3,157.00$ <br />10 TOPSOIL AND SEEDING 525 SYS 9.00$ 4,725.00$ 32.00$ 16,800.00$ 35.00$ 18,375.00$ 31.18$ 16,369.50$ 26.95$ 14,148.75$ <br />11 TREE, REMOVE, 6-IN 3 EA 850.00$ 2,550.00$ 350.00$ 1,050.00$ 250.00$ 750.00$ 1,962.82$ 5,888.46$ 325.00$ 975.00$ <br />12 TREE, REMOVE, 18-IN 3 EA 1,800.00$ 5,400.00$ 850.00$ 2,550.00$ 650.00$ 1,950.00$ 2,912.82$ 8,738.46$ 700.00$ 2,100.00$ <br />13 PLANT, DECIDUOUS TREE, SINGLE STEM. 2-IN TO 2.5-IN 12 EA 515.00$ 6,180.00$ 1,100.00$ 13,200.00$ 975.00$ 11,700.00$ 975.00$ 11,700.00$ 975.00$ 11,700.00$ <br />124,855.00$ 169,030.00$ 187,591.00$ 190,076.35$ 204,750.65$ <br />I hereby certify that the above truly and accurately represents bids received for this project on August 8, 2023 <br />Gemma Stanton, Project Engineer <br />Y <br />Selge Construction <br />Selge Construction <br />Y <br />Y <br />Y <br />Engineer's Estimate Milestone Contractors <br />Engineer's Estimate Milestone Contractors <br />Premium Concrete Services <br />Premium Concrete Services <br />Rieth-Riley Construction <br />Rieth-Riley Construction <br />Y <br />Y <br />Y <br />Bid Bond <br />Non-Collusion Affadavit Y <br />M/WBE Inclusion <br />Addendum #1 <br />Y Y Y Y <br />Y Y Y Y <br />Page 2 of 2