�s
<br />BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: South Well Field Water Treatment Plant and Distribution System �V-=
<br />Improvements — Contract B — Watermain
<br />Project Number: 117-059B
<br />For Bids Due: August 22, 2023
<br />Contractor Name: G.E. Marshall, Inc.
<br />BASE BID
<br />Item
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />No.
<br />1
<br />CONSTRUCTION ENGINEERING
<br />1
<br />LS
<br />$ 53,770.00
<br />$ 53,770.00
<br />2
<br />MOBILIZATION AND
<br />I
<br />LS
<br />$ 93,500.00
<br />$ 93,500.00
<br />DEMOBILIZATION
<br />3
<br />CLEARING AND GRUBBING
<br />2.1
<br />AC
<br />$ 14,785.56
<br />$ 31,049.68
<br />4
<br />TEMPORARY EROSION CONTROL
<br />1
<br />LS
<br />$ 77,606.36
<br />$ 77,606.36
<br />5
<br />COMPACTED AGGREGATE, NO. 53
<br />776
<br />TON
<br />$ 52.25
<br />$ 40,546.00
<br />6
<br />HARD SURFACE REMOVALS
<br />1
<br />LS
<br />$ 15,990.50
<br />$ 15,990.50
<br />7
<br />HMA, SURFACE, TYPE B 9.5 mm
<br />20
<br />TON
<br />$ 623.75
<br />$ 12,475.00
<br />8
<br />HMA, BASE, TYPE B 25.0 mm
<br />54
<br />TON
<br />$ 326.00
<br />$ 17,604.00
<br />9
<br />MULCHED SEEDING, R
<br />10200
<br />SY
<br />$ 2.41
<br />$ 24,582.00
<br />10
<br />REMOVE AND REPLACE CHAIN LINK
<br />50
<br />LF
<br />$ 126.47
<br />$ 6,323.50
<br />FENCE AND POSTS
<br />I I
<br />REMOVE AND RESET FARM FIELD
<br />863
<br />LF
<br />$ 21.27
<br />$ 18,356.01
<br />TYPE FENCE AND POSTS
<br />12
<br />JACK AND BORE, 30 IN CASING WITH
<br />40
<br />LF
<br />$ 4,891.54
<br />$ 195,661.60
<br />20 IN CARRIER
<br />13
<br />30 IN CASING WITH 20 IN CARRIER,
<br />23
<br />LF
<br />$ 821.97
<br />$ 18,905.31
<br />GRANULAR BACKFILL
<br />14
<br />24 IN WATERMAIN, DI, CL 50, TRENCH
<br />3
<br />LF
<br />$ 1,641.90
<br />$ 4,925.70
<br />SPOIL BACKFILL
<br />15
<br />20 IN WATERMAIN, DI, CL 50, TRENCH
<br />3599
<br />LF
<br />$ 281.90
<br />$ 1,014,558.10
<br />SPOIL BACKFILL
<br />16
<br />20 IN WATERMAIN, DI, CL 50,
<br />908
<br />LF
<br />$ 353.88
<br />$ 321,323.04
<br />GRANULAR BACKFILL
<br />17
<br />16 IN WATERMAIN, DI, CL 50, TRENCH
<br />9
<br />LF
<br />$ 518.06
<br />$ 4,662.54
<br />SPOIL BACKFILL
<br />18
<br />12 IN WATERMAIN, DUCTILE IRON,
<br />51
<br />LF
<br />$ 212.77
<br />$ 10,851.27
<br />TRENCH SPOIL BACKFILL
<br />19
<br />6 IN WATERMAIN, DUCTILE IRON,
<br />35
<br />LF
<br />$ 180.66
<br />$ 6,323.10
<br />TRENCH SPOIL BACKFILL
<br />20
<br />FIRE HYDRANT ASSEMBLY
<br />5
<br />EA
<br />$ 4,434.61
<br />$ 22,173.05
<br />21
<br />20-INCH BUTTERFLY VALVE AND
<br />10
<br />EA
<br />$ 11,382.40
<br />$ 113,824.00
<br />BOX W/ JOINT RESTRAINTS
<br />22
<br />16-INCH BUTTERFLY VALVE AND
<br />1
<br />EA
<br />$ 7,762.20
<br />$ 7,762.20
<br />BOX W/ JOINT RESTRAINTS
<br />23
<br />12-INCH GATE VALVE AND BOX W/
<br />l
<br />EA
<br />$ 4,093.83
<br />$ 4,093.83
<br />JOINT RESTRAINTS
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7
<br />
|