Project Name: Cleveland Road and Ameritech Drive Intersection Improvements
<br />Project Number: 122-049
<br />For Bids Due: August 8, 2023
<br />ITEM
<br />NO.
<br />ITEM DESCRIPTION
<br />QUANTITY
<br />UNIT
<br />UNIT
<br />PRICE
<br />TOTAL
<br />AMOUNT
<br />1
<br />Construction Engineering
<br />1
<br />LS
<br />$27,975.00
<br />$27,975.00
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />$91,989.60
<br />$91,989.60
<br />3
<br />Clearing Right of Way
<br />1
<br />LS
<br />$18,336.45
<br />$18,336.45
<br />4
<br />Excavation, Common
<br />313
<br />CYS
<br />$69.40
<br />$170,862.80
<br />5
<br />Subgrade Treatment, Type II
<br />1876
<br />SYS
<br />$16.35
<br />$5,559.00
<br />6
<br />Compacted Aggregate, No. 53
<br />625
<br />TON
<br />$66.80
<br />$140,280.00
<br />7
<br />HMA Surface, PG70-22P, 9.5 mm, Type
<br />B
<br />15
<br />TON
<br />$30.25
<br />$74,173.00
<br />8
<br />HMA Intermediate, PG70-22P, 12.5 mm,
<br />Type B
<br />26
<br />TON
<br />$56.15
<br />$45,874.55
<br />9
<br />HMA Base, PG70-22P, 25.Omm, Type B
<br />82
<br />TON
<br />$392.40
<br />$24,721.20
<br />10
<br />Joint Adhesive, Surface
<br />216
<br />LFT
<br />$256.60
<br />$26,943.00
<br />11
<br />Joint Adhesive, Intermediate
<br />216
<br />LFT
<br />$148.80
<br />$49,996.80
<br />12
<br />Liquid Asphalt Sealant
<br />216
<br />LFT
<br />$14.40
<br />$3,110.40
<br />13
<br />Asphalt for Tack Coat
<br />374
<br />SYS
<br />$14.40
<br />$3,110.40
<br />14
<br />PCCP, 11.5"
<br />1305
<br />SYS
<br />$4.05
<br />$874.80
<br />15
<br />PCCP, For Patching
<br />384
<br />SYS
<br />$0.30
<br />$457.80
<br />16
<br />D-1 Contraction Joint
<br />891
<br />LFT
<br />$106.30
<br />$138,721.50
<br />17
<br />Type A Expansion Joint W/Dowels
<br />168
<br />LFT
<br />$147.10
<br />$56,486.40
<br />18
<br />Type E Longitudinal Construction Joints
<br />672
<br />LFT
<br />$63.45
<br />$56,533.95
<br />19
<br />Center Curb, Concrete
<br />3
<br />SYS
<br />$67.60
<br />$11,356.80
<br />20
<br />Curb, Integral, Concrete, 6 in.
<br />56
<br />LFT
<br />$53.70
<br />$36,086.40
<br />21
<br />Sodding, Nursery
<br />48
<br />SYS
<br />$1,047.75
<br />$3,143.25
<br />22
<br />Topsoil
<br />3
<br />CYS
<br />$60.90
<br />$3,410.40
<br />23
<br />Pipe, Type 2, Circular, 12 in.
<br />2
<br />LFT
<br />$50.10
<br />$6,513.00
<br />24
<br />Pipe, Type 2, Circular w/Slotted Vane
<br />Drain, 12 in.
<br />40
<br />LFT
<br />$16.50
<br />$8,398.50
<br />25
<br />Casting, Inlet, Adjust to Grade
<br />2
<br />EA
<br />$150.00
<br />$450.00
<br />26
<br />Line, Multi -Component, Broken, White, 4
<br />in.
<br />430
<br />LFT
<br />$923.35
<br />$1,846.70
<br />27
<br />Line, Multi -Component, Solid, White, 4 in.
<br />1375
<br />LFT
<br />$381.85
<br />$15,274.00
<br />28
<br />Line, Multi -Component, Solid, Yellow, 4
<br />in.
<br />1368
<br />LFT
<br />$173.90
<br />$3,478.00
<br />29
<br />Line, Multi -Component, Solid, White, 10
<br />in.
<br />2060
<br />-LFT-
<br />$916.65
<br />$1,833.30
<br />30
<br />Grooving for Pavement Markings
<br />5233
<br />LFT
<br />$894.90
<br />$1,789.80
<br />31
<br />Transverse Marking, Multi -Component,
<br />Crosshatch Line, White, 12 in.
<br />145
<br />LFT
<br />$894.90
<br />$894.90
<br />32
<br />Transverse Marking, Multi -Component,
<br />Stop Line, White, 24 in.
<br />168
<br />LFT
<br />$3.00
<br />$2,049.00
<br />33
<br />Pavement Message Marking, Multi-
<br />Component, Lane Indication Arrow
<br />3
<br />EA
<br />$3.00
<br />$5,997.00
<br />34
<br />Signal Head, 3-Section, 12", Red, Amber,
<br />Green, Amber Arrow, Green Arrow
<br />6
<br />EA
<br />$3.00
<br />$4,104.00
<br />Version 09/29/2021 Contractor's Bid for Public Works - 7
<br />
|