Laserfiche WebLink
<br /> <br />K I L <br />ARCHITECTURE <br />P L A N N I N G <br />www.kilarchitecture.com <br /> <br />1 1 2 6 L I N C O L N W A Y E A S T S O U T H B E N D I N 4 6 6 0 1 ( 5 7 4 ) 2 8 8 . 2 6 5 4 V O I C E 2 8 9 . 2 4 2 0 F A X <br /> E: New Window in New Opening – Photo 37 <br /> <br />8.) Front Porch Repairs: Photos 37-39 <br /> The existing front porch will need to be removed temporarily (with the roof <br />supported) in order to facilitate proposed waterproofing of the foundation beneath. This <br />project proposes recasting the porch floor with new concrete (like in kind materials) which <br />will be finished to slope away from the main house to shed water, which it currently does not <br />do effectively. Timber structure of the porch will be salvaged, repaired, and re-installed after <br />foundation works are completed and the new porch floor is cast. Per request of the owner, <br />this project proposes to retain all of the wood timber components, but to omit the <br />replacement of the brick masonry infill and leave these panels void of infill. Additionally, per <br />historic photographs there is evidence of large spindles located between the column <br />openings. These spindles remain on the property and are being proposed for reinstallation on <br />the porch. <br />