My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. 1205 East Wayne Street North_COA 2023-0803
sbend
>
Public
>
Historic Preservation
>
2023
>
August
>
3. 1205 East Wayne Street North_COA 2023-0803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 1:39:31 PM
Creation date
8/14/2023 11:55:37 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
1205 East Wayne Street North
HPC Document Type
Certification
HPC Local Historic District
viii. East Wayne Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Empire Slate Roof System Page 8 of 10 <br />EcoStar LLC Gold Star Spec Updated 02/2021 <br />a. GAF VersaShield underlayment (or an EcoStar approved alternate) must be installed over <br />the entire deck surface including over the Glacier Guard in conjunction with EcoStar Class A <br />Empire Slate tiles for those projects requiring a UL Class A fire rating. GAF VersaShield (or <br />an Ecostar approved alternate) should be installed per manufacturer’s specification. Install <br />Class A underlayment according to the manufacturer’s specifications. If a ridge vent is <br />required, overlap the ridge slot with the Class A underlayment and fold it back over the last <br />row of field tiles before installation of the ridge vent. <br />F. Empire Slate Tile Installation <br /> <br />1. After installing underlayment, and before installing the Empire Slate tiles, clean the surface of <br />debris and dirt. <br /> <br />2. All Empire Slate tiles come with shade variation. EcoStar tiles that have been ordered and <br />supplied to the job site under one EcoStar sales order number are blended at the factory and do <br />not need to be blended on site before installation. It is always the responsibility of the applicator <br />to make frequent inspections from the ground or other vantage point to ensure that random <br />shading occurs. EcoStar will not be held responsible for correcting the appearance of non- <br />random installations. Roofers must inspect the roof frequently to prevent customer <br />dissatisfaction. <br /> <br />NOTE: If EcoStar tiles have been supplied to the job site under two or more EcoStar sales order <br />numbers, all tiles must be blended together on site before installation. Specific blending <br />instructions can be found at www.ecostarllc.com on the “Resource Library” page. EcoStar will <br />not be held responsible for correcting the appearance of unblended installations. <br /> <br />Natural weathering will produce further shade variations, even in tiles appearing to be identical <br />in color when new. <br /> <br />3. Minimum Fastening – No less than 2 EcoStar ring shank fasteners per tile shall be used with a <br />minimum length of 1-1/2” (38 mm). Fasteners should be installed at the designated “nail here” <br />marks on the tile. Failure to fasten the tile at these locations may result in a “lifted” tile that will <br />require removal and replacement. <br /> <br />4. CAUTION: When using a pneumatic nailer, care should be taken to ensure that nails are not <br />over driven causing the tiles to curl upward. If tiles have been installed with over driven nails <br />causing the ends of the tile to curve upward, tiles will never lay flat. Overdriven tiles must be <br />removed and re-nailed properly. Never hold the tile from behind while nailing, as this will cause <br />an upward curl of the tile. <br /> <br />5. Do not install tiles against each other. A minimum gap of 3/8” (9.5 mm) must be maintained <br />between installed tiles. A minimum 3/8” (9.5 mm) gap must be maintained between installed <br />tiles and any sidewalls or roof protrusions. <br /> <br />6. It is the responsibility of the Gold Star Authorized Applicator to ensure that each Empire Slate <br />tile has been flexed to provide a downward curve prior to fastening. Do not install tiles with an <br />upward curve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.