My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. 1205 East Wayne Street North_COA 2023-0803
sbend
>
Public
>
Historic Preservation
>
2023
>
August
>
3. 1205 East Wayne Street North_COA 2023-0803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2023 1:39:31 PM
Creation date
8/14/2023 11:55:37 AM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
1205 East Wayne Street North
HPC Document Type
Certification
HPC Local Historic District
viii. East Wayne Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Empire Slate Roof System Page 6 of 10 <br />EcoStar LLC Gold Star Spec Updated 02/2021 <br />2. Tile Fasteners <br /> <br />a. EcoStar ring shank roofing nail with a 3/8” (9.5 mm) diameter head and a minimum of 1-1/2” <br />(38 mm) long shank made from stainless steel. Nails can b e supplied either as a hand-drive <br />style or in coils for use in pneumatic tools. The EcoStar ring shank roofing nail is required <br />for fastening of all EcoStar roof tiles. <br /> <br />PART 3 - EXECUTION <br />3.01 SUBSTRATE CRITERIA <br />A. The building owner or owner’s representative is responsible for providing and determining that the <br />substrate is suitable to receive the Empire Slate tile roof system and the Authorized EcoStar Gold Star <br />Applicator should not proceed until all defects have been corrected. <br /> <br />B. The Empire Slate roof system may only be applied over: <br /> <br />1. Minimum 15/32” (12 mm) plywood or 7/16” (11 mm) OSB decking, properly gapped for <br />expansion. <br /> <br />2. Minimum ¾” (19 mm) tongue and groove wood decking with end gaps not exceeding ¼” (6 <br />mm), and board widths not exceeding 6” (152 mm). <br /> <br />3. Approved metal deck systems – (Metal deck systems may require the installation of appropriate <br />thickness nail base insulation prior to attaching the EcoStar tiles). Contact EcoStar’s technical <br />department for specifics. <br /> <br />4. Appropriate clearance on underside of decking or sheathing must be provided for proper <br />penetration of the EcoStar fastener. <br /> <br />C. Minimum slope of substrate for installation of Empire Slate roof systems shall be a minimum of 3/12 <br />(14) for 6” (152 mm) exposure installation and a minimum of 4/12 (18) for 7” (178 mm) exposure <br />installation. Contact the EcoStar technical department for approval of applications on lower slopes or <br />exceptions to this requirement. <br />3.02 SUBSTRATE PREPARATION <br />A. The building owner or owner’s representative is responsible for ensuring that all wet or damaged <br />substrate has been removed in a re-roofing application. <br /> <br />B. Existing roof material MUST be removed and a clean substrate free of foreign material be provided prior <br />to the installation of the Empire Slate tile roof system. Empire Slate tiles may NOT be installed directly <br />over any existing roof material or system. <br />3.03 INSTALLATION <br />A. Flashing & Sheet Metal – Install sheet metal and flashing metal in all valleys and where required. <br />EcoStar recommends a V-type, W-type or Double W-type metal valley flashing be used at all valleys. <br /> <br />B. Where required, install metal edging at all eaves and roof edges.
The URL can be used to link to this page
Your browser does not support the video tag.