Laserfiche WebLink
14+0015+0016+0017+00LASALLE AVE <br />LASALLE AVE STREETSCAPE <br />0 <br />Feet <br />5 10 <br />CITY OF SOUTH BEND <br />PROPOSED PEDESTRIAN CROSSING TO CONNECT RIVERSIDE TRAIL <br />© 2023 JPR - All Rights Reserved <br />South Bend, IN <br />p: 574.232.4388 <br />Fort Wayne, IN <br />p: 260.422.2522 <br />J O N E S <br />P E T R I E <br />R A F I N S K I <br />Front ViewGround Rod1' Min.Edge of Pavement <br />Ground Wire <br />Pedestal Foundation <br />Grounding Lug Inside <br />Back of Base <br />Pedestal Base <br />Pedestal Pole, 4 1 <br />2" Dia. <br />W16-7P (Lt.) <br />(24 IN x 12 IN) <br />W11-15 w/ LED Warning Lights <br />Front and Back <br />(36 IN x 36 IN) <br />Dome Cap <br />Solar Panel <br />(Orientation Varies <br />by Site Conditions)7'5'16' to 20'42" (Min) to 48" (Max)R10-3c <br />Actuator with Tactile Arrow <br />Side View <br />No. 6 Ground Wire <br />Steel Banding <br />Battery Cabinet and <br />Program Timing Module <br />1' Min. <br />SP3-2 Solar Powered Flashing Pedestrian <br />Crossing Signage Assembly <br />N.T.S. <br />NOTE: 2 ASSEMBLIES REQUIRED IN THE <br />ASSEMBLY SYSTEM <br />10' WIDE PEDESTRIAN <br />CROSSWALK AT EXISTING <br />BRIDGE APPROACH SLAB <br />SURFACE GRADE <br />6", BEVELED REVEAL RAISED <br />BARRIER PEDESTRIAN SAFETY <br />MEDIAN CONCRETE CURB <br />ISLANDS BONDED TO BRIDGE <br />APPROACH SLAB SURFACE <br />BRIDGE <br />APPROACH <br />SLAB <br />BRIDGE <br />DECK <br />2' <br />CURB RAMP <br />(ADA) <br />CURB RAMP <br />(ADA) <br />10'5'5'10'EXISTINGRIVERSIDE TRAILEXIS <br />T <br />INGRIVERS <br />IDE <br /> TRA <br />I <br />L <br />BRIDGE <br />APPROACH <br />SLAB <br />SA <br />SA <br />SOLAR POWERED FLASHING <br />PEDESTRIAN ACTUATED <br />SIGN ASSEMBLY <br />SA <br />10'11'10'12'12'11'10'11'PROPOSED PAVEMENT <br />MARKINGS (TYP) <br />PROPOSED PAVEMENT <br />MARKINGS (TYP) <br />STA. 15+29.5, LINE 'A' <br />BEGIN FULL DEPTH <br />PAVEMENT <br />RECONSTRUCTION <br />LINE 'A' <br />PROPOSED PAVEMENT <br />MARKINGS (TYP) <br />ST JOSEPH <br />RIVER <br />BRIDGE ST JOSEPH RIVERPROPOSED PAVEMENT <br />MARKINGS (TYP)H:\2021 Projects\2021-0489\04_Drawings\DWG\LaSalle Ave Streetscape\CROSSWALK DETAILS.dwg, 7/18/2023 3:48:13 PM