My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Mngr. as Constructor Agreement - MLK Dream Center – C.H. Garmong & Son, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Mngr. as Constructor Agreement - MLK Dream Center – C.H. Garmong & Son, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:15:35 PM
Creation date
8/8/2023 1:15:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Init. <br />/ <br />AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” <br />“AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks of The American Institute of Architects. This document was produced at 15:11:22 ET <br />on 07/31/2023 under Order No.3104237129 which expires on 08/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance <br />with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (1769632854) <br />3 <br />This project sits on an approximately 6-acre site centrally located in South Bend, IN surrounded by the streets of Linden <br />Avenue, Birdsell Street, Orange Street, and College Street. It is the former site of the Linden School. A geographical <br />report was conducted by Advanced Engineering Services. <br />§ 1.1.3 The Owner’s budget for the Guaranteed Maximum Price, as defined in Article 6: <br />(Provide total and, if known, a line item breakdown.) <br />Eighteen Million and none/100 cents ($18,000,000.00) inclusive of all construction and CMC costs. <br />§ 1.1.4 The Owner’s anticipated design and construction milestone dates: <br />.1 Design phase milestone dates, if any: <br />100% Construction Documents are anticipated to be completed by June 30, 2023 <br />.2 Construction commencement date: <br />TBD as established in GMP Amendment anticipated in August 2023 <br />.3 Substantial Completion date or dates: <br />TBD as established in the GMP Amendment, anticipated December 2024. <br />.4 Other milestone dates: <br />N/A <br />§ 1.1.5 The Owner’s requirements for accelerated or fast-track scheduling, or phased construction, are set forth below: <br />(Identify any requirements for fast-track scheduling or phased construction.) <br />TBD as mutually agreed upon by Construction Manager and Owner <br />§ 1.1.6 Intentionally Omitted <br />§ 1.1.6.1 Intentionally Omitted <br />§ 1.1.7 Other Project information: <br />(Identify special characteristics or needs of the Project not provided elsewhere.) <br />N/A <br />§ 1.1.8 The Owner identifies the following representative in accordance with Section 4.2: <br />(List name, address, and other contact information.) <br />Patrick Sherman <br />City of South Bend <br />227 W. Jefferson Blvd, Ste. 1316 <br />South Bend, IN 46601 <br />psherman@southbendin.gov <br />(574)274-2734 <br />Kara Boyles <br />City of South Bend <br />2227 W. Jefferson Blvd., Ste. 1316
The URL can be used to link to this page
Your browser does not support the video tag.