My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Mngr. as Constructor Agreement - MLK Dream Center – C.H. Garmong & Son, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Mngr. as Constructor Agreement - MLK Dream Center – C.H. Garmong & Son, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:15:35 PM
Creation date
8/8/2023 1:15:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Document A133® – 2019 <br />Standard Form of Agreement Between Owner and Construction Manager as <br />Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed <br />Maximum Price <br />Init. <br />/ <br />AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” <br />“AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks of The American Institute of Architects. This document was produced at 15:11:22 ET <br />on 07/31/2023 under Order No.3104237129 which expires on 08/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance <br />with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (1769632854) <br />1 <br />ADDITIONS AND DELETIONS: <br />The author of this document has <br />added information needed for its <br />completion. The author may also <br />have revised the text of the original <br />AIA standard form. An Additions and <br />Deletions Report that notes added <br />information as well as revisions to the <br />standard form text is available from <br />the author and should be reviewed. A <br />vertical line in the left margin of this <br />document indicates where the author <br />has added necessary information <br />and where the author has added to or <br />deleted from the original AIA text. <br />This document has important legal <br />consequences. Consultation with an <br />attorney is encouraged with respect <br />to its completion or modification. <br />AIA Document A201™–2017, <br />General Conditions of the Contract <br />for Construction, is adopted in this <br />document by reference. Do not use <br />with other general conditions unless <br />this document is modified. <br />AGREEMENT made as of the 31st day of May in the year 2023 <br />(In words, indicate day, month, and year.) <br />BETWEEN the Owner: <br />(Name, legal status, address, and other information) <br />City of South Bend <br />227 W. Jefferson Blvd., Ste. 1316 <br />South Bend, IN 46601 <br />and the Construction Manager: <br />(Name, legal status, address, and other information) <br />C.H. Garmong & Son, Inc. <br />3050 Poplar Street <br />Terre Haute, IN 47803 <br />for the following Project: <br />(Name, location, and detailed description) <br />Martin Luther King Jr. Dream Center <br />1522 Linden Ave. <br />South Bend, IN 46628 <br />The Architect: <br />(Name, legal status, address, and other information) <br />Meticulous Design + Architecture <br />25 N. Pine Street, Ste. B <br />Indianapolis, IN 46202 <br />The Owner and Construction Manager agree as follows.
The URL can be used to link to this page
Your browser does not support the video tag.