My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Mngr. as Constructor Agreement - MLK Dream Center – C.H. Garmong & Son, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Mngr. as Constructor Agreement - MLK Dream Center – C.H. Garmong & Son, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:15:35 PM
Creation date
8/8/2023 1:15:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Document A201® – 2017 <br />General Conditions of the Contract for Construction <br />Init. <br />/ <br />AIA Document A201 – 2017. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997, 2007 and 2017. All rights <br />reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks of <br />The American Institute of Architects. This document was produced at 16:07:00 ET on 07/31/2023 under Order No.3104237129 which expires on 08/14/2023, is not <br />for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, <br />e-mail docinfo@aiacontracts.com. <br />User Notes: (1345795138) <br />1 <br />ADDITIONS AND DELETIONS: <br />The author of this document has <br />added information needed for its <br />completion. The author may also <br />have revised the text of the original <br />AIA standard form. An Additions and <br />Deletions Report that notes added <br />information as well as revisions to the <br />standard form text is available from <br />the author and should be reviewed. A <br />vertical line in the left margin of this <br />document indicates where the author <br />has added necessary information <br />and where the author has added to or <br />deleted from the original AIA text. <br />This document has important legal <br />consequences. Consultation with an <br />attorney is encouraged with respect <br />to its completion or modification. <br />For guidance in modifying this <br />document to include supplementary <br />conditions, see AIA Document <br />A503™, Guide for Supplementary <br />Conditions. <br />for the following PROJECT: <br />(Name and location or address) <br />Martin Luther King Jr. Dream Center <br />1522 Linden Ave. <br />South Bend, IN 46628 <br />THE OWNER: <br />(Name, legal status and address) <br />City of South Bend <br />227 W. Jefferson Blvd., Ste. 1316 <br />South Bend, IN 46601 <br />THE ARCHITECT: <br />(Name, legal status and address) <br />Meticulous Design + Architecture <br />25 N. Pine Street, Ste. B <br />Indianapolis, IN 46202 <br />TABLE OF ARTICLES <br />1 GENERAL PROVISIONS <br />2 OWNER <br />3 CONTRACTOR <br />4 ARCHITECT <br />5 SUBCONTRACTORS <br />6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS <br />7 CHANGES IN THE WORK <br />8 TIME <br />9 PAYMENTS AND COMPLETION <br />10 PROTECTION OF PERSONS AND PROPERTY <br />11 INSURANCE AND BONDS <br />12 UNCOVERING AND CORRECTION OF WORK <br />13 MISCELLANEOUS PROVISIONS
The URL can be used to link to this page
Your browser does not support the video tag.