Laserfiche WebLink
Init. <br />/ <br />AIA Document A133 – 2019. Copyright © 1991, 2003, 2009, and 2019. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” <br />“AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks of The American Institute of Architects. This document was produced at 15:11:22 ET <br />on 07/31/2023 under Order No.3104237129 which expires on 08/14/2023, is not for resale, is licensed for one-time use only, and may only be used in accordance <br />with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. <br />User Notes: (1769632854) <br />13 <br />§ 6.3.5 If no specific provision is made in Section 6.1.3 for adjustment of the Construction Manager’s Fee in the case of <br />changes in the Work, or if the extent of such changes is such, in the aggregate, that application of the adjustment <br />provisions of Section 6.1.3 will cause substantial inequity to the Owner or Construction Manager, the Construction <br />Manager’s Fee shall be equitably adjusted on the same basis that was used to establish the Fee for the original Work, and <br />the Guaranteed Maximum Price shall be adjusted accordingly. <br />ARTICLE 7 COST OF THE WORK FOR CONSTRUCTION PHASE <br />§ 7.1 Costs to Be Reimbursed <br />§ 7.1.1 The term Cost of the Work shall mean costs necessarily incurred by the Construction Manager in the proper <br />performance of the Work. The Cost of the Work shall include only the items set forth in Sections 7.1 through 7.7. <br />§ 7.1.2 Where, pursuant to the Contract Documents, any cost is subject to the Owner’s prior approval, the Construction <br />Manager shall obtain such approval in writing prior to incurring the cost. <br />§ 7.1.3 Costs shall be at rates not higher than the standard rates paid at the place of the Project, except with prior approval <br />of the Owner. <br />§ 7.2 Labor Costs <br />§ 7.2.1 Wages or salaries of construction workers directly employed by the Construction Manager to perform the <br />construction of the Work at the site or, with the Owner’s prior approval, at off-site workshops. <br />§ 7.2.2 Wages or salaries of the Construction Manager’s supervisory and administrative personnel at a fixed cost of <br />$53,333 per month. <br />§ 7.2.2.1 <br />(Paragraphs deleted) <br />Intentionally Omitted <br />§ 7.2.3 Intentionally Omitted <br />§ 7.2.4 Costs paid or incurred by the Construction Manager, as required by law or collective bargaining agreements, for <br />taxes, insurance, contributions, assessments and benefits and, for personnel not covered by collective bargaining <br />agreements, customary benefits such as sick leave, medical and health benefits, holidays, vacations and pensions, <br />provided such costs are based on wages and salaries included in the Cost of the Work under Sections 7.2.1. <br />§ 7.2.5 If agreed rates for labor costs, in lieu of actual costs, are provided in this Agreement, the rates shall remain <br />unchanged throughout the duration of this Agreement, unless the parties execute a Modification. <br />§ 7.3 Subcontract Costs <br />Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts <br />and this Agreement. Costs for subcontract insurance, performance & payment bonds, etc. as deemed necessary by the <br />Construction Manager. <br />§ 7.4 Costs of Materials and Equipment Incorporated in the Completed Construction <br />§ 7.4.1 Costs, including transportation and storage, of materials and equipment incorporated, or to be incorporated, in the <br />completed construction. <br />§ 7.4.2 Costs of materials described in the preceding Section 7.4.1 in excess of those actually installed to allow for <br />reasonable waste and spoilage. <br />§ 7.5 Costs of Other Materials and Equipment, Temporary Facilities and Related Items <br />§ 7.5.1 Costs of transportation, storage, installation, dismantling, maintenance, and removal of materials, supplies, <br />temporary facilities, machinery, equipment and hand tools not customarily owned by construction workers that are <br />provided by the Construction Manager at the site and fully consumed in the performance of the Work. .