My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 3 to OEA - Campeau Streetscape Proj No. 121-073 – Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 3 to OEA - Campeau Streetscape Proj No. 121-073 – Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2023 1:15:15 PM
Creation date
8/8/2023 1:15:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated April 14, 2020. <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. _3____ <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />April 14, 2020 <br /> <br />b. <br /> <br />Owner: <br /> <br />Board of Public Works, City of South Bend <br /> <br />c. <br /> <br />Engineer: <br /> <br />Abonmarche Consultants, Inc <br /> <br />d. <br /> <br />Project: <br /> <br />Howard Street Conceptual Design <br /> <br />2. Description of Modifications: <br />a. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: <br />Task Order #5: Intersection Assessment: <br />· Review and Assess the constructed inteserction of Notre Dame Avenue and <br />South Bend Avenue, including the following items: <br />o Review the constructed South Bend Avenue and Notre Dame Avenue <br />intersection for conformance with the plans and specifications. <br />o Participate in an initial assessment onsite meeting with City Staff. <br />o Import contractor staking points into the proposed grading CAD file and <br />compare the design to the staked points. <br />o Perform topographic as-built survey of the intersection. Overlay the as- <br />built survey on the proposed plans and detail differences in line and <br />grade. <br />o Perform field check to detail deficieines of the constructed intersection. <br />o Prepare letter report describing the findings of the as-built and field <br />check. <br />o Attend meetings with City staff and Contractor <br />o Revise construction plans to incorporate design changes <br /> <br />Task Order #6: Intesrection Reconstruction Inspection <br />· Perform full time inspection services during removal and replacement of the <br />constructed intersection to ensure conformance with the plans and <br />specifications. <br />· Prepare Daily Reports <br />· Coordinate work and coordination with City staff as necessary <br />· Send weekly status updates to City staff
The URL can be used to link to this page
Your browser does not support the video tag.