Change Order No 3 - Coal Line Trail, Phase IIB Proj No. 122-035 - Milestone Contractors INDOT
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 3 - Coal Line Trail, Phase IIB Proj No. 122-035 - Milestone Contractors INDOT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 12:12:28 PM
Creation date
8/8/2023 1:13:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:B -44292 INDIANA <br />Change Order No:003 Department of Transportation <br />Contract: B -44292 <br />Project: 2200199 - State:220019900LC4 <br />Change Order Nbr: 003 <br />Change Order Description: Pier Cap 4 reconstruction <br />Reason Code: CHANGED COND, Constructability Related <br />Date:05/30/2023 <br />Page: 3 <br />CLN PCN PLN Item Code Unit Unit Price CO oty Comment Amount Change <br />0083 2200199 0083 711-91996 LS 27,652.960 1.000 C Amount:$ 27,652.96 <br />Item Description: REPAIR EXISTING STRUCTURE <br />Supplemental Description1: Repair Pier Cap #4 <br />Supplemental Description2: <br />Total Value for Change Order 003 = $ 27,652.96 <br />Contract Completion Date Time Adjustment <br />Original Completion dt: 05/01/2024 Adj comp) dt 05/06/2024 Adj No. of Days 5 <br />Explanation: For rehab of pier 4 <br />Milestone Time Adjustment <br />Milestone Nbr: 01 <br />Milestone Description: CSGP INTERMEDIATE COMPLETION DATE <br />Original Completion dt: 09/01/2023 Adj comps dt 09/06/2023 Adj No. of Days 5 <br />Explanation: For the rehab of pier 4. <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The plans call out to pour a new beam seat on top of pier 4 which is located out in the middle of the St. Joseph River. Upon cleaning all of the <br />debris off of the top of the pier cap and around the bearings, there were cracks in the existing concrete. Cores were taken of the concrete cap <br />and the concrete fell apart and was considerably weaker than any of the other pier caps. The design engineer was contacted and provided <br />pictures of the cap and the cores. It was determined between the design engineer, INDOT and the City of South Bend to remove and replace the <br />pier cap. The cost to complete this work is a Lump Sum cost of $27,652.96. Because this pier is out in the middle of the St. Joseph River, we are <br />accessing this pier from walking over a temporary platform to the pier location and climbing down to the barge. The debris from the removal will <br />have to be dropped on the barge, the barge moved to the shore and the material of loaded. The new concrete will be wheel barrowed to the pier <br />from the walkway and lowered to the pour area by buckets. The reconstruction of this pier is very labor intensive and thus making the unit price <br />for the concrete high. This price also includes the removal of the pier cap. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor: Milestone Contractors LP Signed By: <br />Date: 5/30/2023 <br />Carl Tungate, Const. Manager <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.