Laserfiche WebLink
BID TABULATION <br />2023 Concrete Repairs <br />Project No: 123-022 <br />Base Bid <br />Item No. Description Quantity Unit <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />3 <br />Inspection Hole, 3 FT Depth or Less <br />50 <br />EA <br />4 <br />Inspection Hole, Greater than 3 FT <br />10 <br />EA <br />5 <br />Common Excavation <br />7,666 <br />CYS <br />6 <br />Milling, 2" <br />6,932 <br />SYS <br />7 <br />Subgrade Treatment Type II <br />19981 <br />SYS <br />8 <br />HMA Surface, 9.5 mm - Type B <br />2,270 <br />TONS <br />9 <br />HMA Intermediate, 12.5mm - Type B <br />2511 <br />TONS <br />10 <br />HMA Base, 25 mm - Type B <br />4019 <br />TONS <br />11 <br />Tack Coat <br />8 <br />TONS <br />12 <br />Joint Adhesive, Surface <br />17374 <br />LFT <br />13 <br />Adjust Manhole to Grade <br />9 <br />EA <br />14 <br />Adjust Water Valve Structure to Grade <br />6 <br />EA <br />15 <br />Adjust Inlet to Grade <br />6 <br />EA <br />16 <br />Line, Thermoplastic, Solid, White, 6" <br />676 <br />LFT <br />17 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />2372 <br />LFT <br />18 <br />Grooving for Pavement Markings, 4" <br />2372 <br />LFT <br />19 <br />Transverse Marking, Thermoplastic, Solid, White, 24" <br />137 <br />LFT <br />20 <br />Concrete Curb Ramp, Removal <br />35 <br />SYS <br />21 <br />Concrete Curb Ramp, Installation <br />196 <br />SYS <br />22 <br />Concrete Curb & Gutter, Replacement <br />844 <br />LFT <br />23 <br />Concrete Standard Curb, Replacement <br />7592 <br />LFT <br />24 <br />Concrete Sidewalk, 4-Inch <br />924 <br />LFT <br />25 <br />Sodding, Nursery <br />3404 <br />SYS <br />26 <br />PCP for Approaches, 6-IN <br />1,713 <br />SYS <br />27 <br />Speed Humps <br />2 <br />EA <br />28 <br />ISian Relocation <br />I 1 <br />EA <br />For Bids Due: July 25, 2023 <br />Engineer's Estimate <br />Unit Price Item Total <br />Milestone Contractors North, Inc. <br />Unit Price Item Total <br />Rieth-Riley Construction Co., Inc. <br />Unit Price Item Total <br />$ 190,890.58 <br />$ 190,890.58 <br />$ <br />70,000.00 <br />$ <br />70,000.00 <br />$ <br />112,000.00 <br />$ <br />112,000.00 <br />$ 148,470.45 <br />$ 148,470.45 <br />$ <br />131,378.80 <br />$ <br />131,378.80 <br />$ <br />140,000.00 <br />$ <br />140,000.00 <br />$ <br />20.00 <br />$ 1,000.00 <br />$ <br />795.00 <br />$ <br />39,750.00 <br />$ <br />50.00 <br />$ <br />2,500.00 <br />$ <br />25.00 <br />$ 250.00 <br />$ <br />1,860.00 <br />$ <br />18,600.00 <br />$ <br />100.00 <br />$ <br />1,000.00 <br />$ <br />60.00 <br />$ 459,960.00 <br />$ <br />51.50 <br />$ <br />394,799.00 <br />$ <br />65.00 <br />$ <br />498,290.00 <br />$ <br />3.40 <br />$ 23,568.80 <br />$ <br />4.80 <br />$ <br />33,273.60 <br />$ <br />6.00 <br />$ <br />41,592.00 <br />$ <br />24.00 <br />$ 479,544.00 <br />$ <br />8.80 <br />$ <br />175,832.80 <br />$ <br />20.00 <br />$ <br />399,620.00 <br />$ <br />100.00 <br />$ 227,000.00 <br />$ <br />116.00 <br />$ <br />263,320.00 <br />$ <br />112.00 <br />$ <br />254,240.00 <br />$ <br />95.00 <br />$ 238,545.00 <br />$ <br />98.00 <br />$ <br />246,078.00 <br />$ <br />100.00 <br />$ <br />251,100.00 <br />$ <br />92.00 <br />$ 369,748.00 <br />$ <br />88.00 <br />$ <br />353,672.00 <br />$ <br />90.00 <br />$ <br />361,710.00 <br />$ <br />1.05 <br />$ 8.40 <br />$ <br />1,700.00 <br />$ <br />13,600.00 <br />$ <br />660.00 <br />$ <br />5,280.00 <br />$ <br />1.00 <br />$ 17,374.00 <br />$ <br />0.10 <br />$ <br />1,737.40 <br />$ <br />0.60 <br />$ <br />10,424.40 <br />$ <br />315.00 <br />$ 2,835.00 <br />$ <br />1,600.00 <br />$ <br />14,400.00 <br />$ <br />645.00 <br />$ <br />5,805.00 <br />$ <br />157.50 <br />$ 945.00 <br />$ <br />310.00 <br />$ <br />1,860.00 <br />$ <br />300.00 <br />$ <br />1,800.00 <br />$ <br />315.00 <br />$ 1,890.00 <br />$ <br />1,200.00 <br />$ <br />7,200.00 <br />$ <br />890.00 <br />$ <br />5,340.00 <br />$ <br />2.89 <br />$ 1,951.95 <br />$ <br />10.00 <br />$ <br />6,760.00 <br />$ <br />0.91 <br />$ <br />615.16 <br />$ <br />0.84 <br />$ 1,992.48 <br />$ <br />4.00 <br />$ <br />9,488.00 <br />$ <br />0.68 <br />$ <br />1,612.96 <br />$ <br />0.53 <br />$ 1,245.30 <br />$ <br />3.00 <br />$ <br />7,116.00 <br />$ <br />0.73 <br />$ <br />1,731.56 <br />$ <br />10.50 <br />$ 1,438.50 <br />$ <br />20.00 <br />$ <br />2,740.00 <br />$ <br />12.89 <br />$ <br />1,765.93 <br />$ <br />70.00 <br />$ 2,450.00 <br />$ <br />260.00 <br />$ <br />9,100.00 <br />$ <br />400.00 <br />$ <br />14,000.00 <br />$ <br />120.00 <br />$ 23,520.00 <br />$ <br />280.00 <br />$ <br />54,880.00 <br />$ <br />515.00 <br />$ <br />100,940.00 <br />$ <br />45.00 <br />$ 37,980.00 <br />$ <br />52.70 <br />$ <br />44,478.80 <br />$ <br />54.72 <br />$ <br />46,183.68 <br />$ <br />30.00 <br />$ 227,760.00 <br />$ <br />56.30 <br />$ <br />427,429.60 <br />$ <br />42.92 <br />$ <br />325,848.64 <br />$ <br />130.00 <br />$ 120,120.00 <br />$ <br />135.00 <br />$ <br />124,740.00 <br />$ <br />85.00 <br />$ <br />78,540.00 <br />$ <br />24.00 <br />$ 81,696.00 <br />$ <br />31.00 <br />$ <br />105,524.00 <br />$ <br />9.40 <br />$ <br />31,997.60 <br />$ <br />170.00 <br />$ 291,210.00 <br />$ <br />124.00 <br />$ <br />212,412.00 <br />$ <br />86.39 <br />$ <br />147,986.07 <br />$ <br />20,000.00 <br />$ 40,000.00 <br />$ <br />14,200.00 <br />$ <br />28,400.00 <br />$ <br />15,650.29 <br />$ <br />31,300.58 <br />$ <br />15.00 <br />$ 15.00 <br />$ <br />430.00 <br />$ <br />430.00 <br />$ <br />1,099.65 <br />$ <br />1,099.65 <br />$ 2,993,408.46 <br />$ <br />2,799,000.00 <br />$ <br />2,874,323.23 <br />BASE TOTAL $ 2,993,408.46 1 $ 2,799,000.00 1 $ 2,874,323.23 <br />Non -Collusion Affadavit <br />Y <br />Y <br />Bid Bond <br />Y <br />Y <br />M/WBE Inclusion <br />Y <br />Y <br />Addendum #1 <br />Y <br />Y <br />Addendum #2 <br />Y <br />Y <br />I hereby certify that the above truly and accurately represents bids received for this project on July 25, 2023 <br />Scott Kreeger, Project Engineer <br />Page 1 of 1 <br />