BID TABULATION
<br />2023 Concrete Repairs
<br />Project No: 123-022
<br />Base Bid
<br />Item No. Description Quantity Unit
<br />1
<br />Maintenance of Traffic
<br />1
<br />LS
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />3
<br />Inspection Hole, 3 FT Depth or Less
<br />50
<br />EA
<br />4
<br />Inspection Hole, Greater than 3 FT
<br />10
<br />EA
<br />5
<br />Common Excavation
<br />7,666
<br />CYS
<br />6
<br />Milling, 2"
<br />6,932
<br />SYS
<br />7
<br />Subgrade Treatment Type II
<br />19981
<br />SYS
<br />8
<br />HMA Surface, 9.5 mm - Type B
<br />2,270
<br />TONS
<br />9
<br />HMA Intermediate, 12.5mm - Type B
<br />2511
<br />TONS
<br />10
<br />HMA Base, 25 mm - Type B
<br />4019
<br />TONS
<br />11
<br />Tack Coat
<br />8
<br />TONS
<br />12
<br />Joint Adhesive, Surface
<br />17374
<br />LFT
<br />13
<br />Adjust Manhole to Grade
<br />9
<br />EA
<br />14
<br />Adjust Water Valve Structure to Grade
<br />6
<br />EA
<br />15
<br />Adjust Inlet to Grade
<br />6
<br />EA
<br />16
<br />Line, Thermoplastic, Solid, White, 6"
<br />676
<br />LFT
<br />17
<br />Line, Thermoplastic, Solid, Yellow, 4"
<br />2372
<br />LFT
<br />18
<br />Grooving for Pavement Markings, 4"
<br />2372
<br />LFT
<br />19
<br />Transverse Marking, Thermoplastic, Solid, White, 24"
<br />137
<br />LFT
<br />20
<br />Concrete Curb Ramp, Removal
<br />35
<br />SYS
<br />21
<br />Concrete Curb Ramp, Installation
<br />196
<br />SYS
<br />22
<br />Concrete Curb & Gutter, Replacement
<br />844
<br />LFT
<br />23
<br />Concrete Standard Curb, Replacement
<br />7592
<br />LFT
<br />24
<br />Concrete Sidewalk, 4-Inch
<br />924
<br />LFT
<br />25
<br />Sodding, Nursery
<br />3404
<br />SYS
<br />26
<br />PCP for Approaches, 6-IN
<br />1,713
<br />SYS
<br />27
<br />Speed Humps
<br />2
<br />EA
<br />28
<br />ISian Relocation
<br />I 1
<br />EA
<br />For Bids Due: July 25, 2023
<br />Engineer's Estimate
<br />Unit Price Item Total
<br />Milestone Contractors North, Inc.
<br />Unit Price Item Total
<br />Rieth-Riley Construction Co., Inc.
<br />Unit Price Item Total
<br />$ 190,890.58
<br />$ 190,890.58
<br />$
<br />70,000.00
<br />$
<br />70,000.00
<br />$
<br />112,000.00
<br />$
<br />112,000.00
<br />$ 148,470.45
<br />$ 148,470.45
<br />$
<br />131,378.80
<br />$
<br />131,378.80
<br />$
<br />140,000.00
<br />$
<br />140,000.00
<br />$
<br />20.00
<br />$ 1,000.00
<br />$
<br />795.00
<br />$
<br />39,750.00
<br />$
<br />50.00
<br />$
<br />2,500.00
<br />$
<br />25.00
<br />$ 250.00
<br />$
<br />1,860.00
<br />$
<br />18,600.00
<br />$
<br />100.00
<br />$
<br />1,000.00
<br />$
<br />60.00
<br />$ 459,960.00
<br />$
<br />51.50
<br />$
<br />394,799.00
<br />$
<br />65.00
<br />$
<br />498,290.00
<br />$
<br />3.40
<br />$ 23,568.80
<br />$
<br />4.80
<br />$
<br />33,273.60
<br />$
<br />6.00
<br />$
<br />41,592.00
<br />$
<br />24.00
<br />$ 479,544.00
<br />$
<br />8.80
<br />$
<br />175,832.80
<br />$
<br />20.00
<br />$
<br />399,620.00
<br />$
<br />100.00
<br />$ 227,000.00
<br />$
<br />116.00
<br />$
<br />263,320.00
<br />$
<br />112.00
<br />$
<br />254,240.00
<br />$
<br />95.00
<br />$ 238,545.00
<br />$
<br />98.00
<br />$
<br />246,078.00
<br />$
<br />100.00
<br />$
<br />251,100.00
<br />$
<br />92.00
<br />$ 369,748.00
<br />$
<br />88.00
<br />$
<br />353,672.00
<br />$
<br />90.00
<br />$
<br />361,710.00
<br />$
<br />1.05
<br />$ 8.40
<br />$
<br />1,700.00
<br />$
<br />13,600.00
<br />$
<br />660.00
<br />$
<br />5,280.00
<br />$
<br />1.00
<br />$ 17,374.00
<br />$
<br />0.10
<br />$
<br />1,737.40
<br />$
<br />0.60
<br />$
<br />10,424.40
<br />$
<br />315.00
<br />$ 2,835.00
<br />$
<br />1,600.00
<br />$
<br />14,400.00
<br />$
<br />645.00
<br />$
<br />5,805.00
<br />$
<br />157.50
<br />$ 945.00
<br />$
<br />310.00
<br />$
<br />1,860.00
<br />$
<br />300.00
<br />$
<br />1,800.00
<br />$
<br />315.00
<br />$ 1,890.00
<br />$
<br />1,200.00
<br />$
<br />7,200.00
<br />$
<br />890.00
<br />$
<br />5,340.00
<br />$
<br />2.89
<br />$ 1,951.95
<br />$
<br />10.00
<br />$
<br />6,760.00
<br />$
<br />0.91
<br />$
<br />615.16
<br />$
<br />0.84
<br />$ 1,992.48
<br />$
<br />4.00
<br />$
<br />9,488.00
<br />$
<br />0.68
<br />$
<br />1,612.96
<br />$
<br />0.53
<br />$ 1,245.30
<br />$
<br />3.00
<br />$
<br />7,116.00
<br />$
<br />0.73
<br />$
<br />1,731.56
<br />$
<br />10.50
<br />$ 1,438.50
<br />$
<br />20.00
<br />$
<br />2,740.00
<br />$
<br />12.89
<br />$
<br />1,765.93
<br />$
<br />70.00
<br />$ 2,450.00
<br />$
<br />260.00
<br />$
<br />9,100.00
<br />$
<br />400.00
<br />$
<br />14,000.00
<br />$
<br />120.00
<br />$ 23,520.00
<br />$
<br />280.00
<br />$
<br />54,880.00
<br />$
<br />515.00
<br />$
<br />100,940.00
<br />$
<br />45.00
<br />$ 37,980.00
<br />$
<br />52.70
<br />$
<br />44,478.80
<br />$
<br />54.72
<br />$
<br />46,183.68
<br />$
<br />30.00
<br />$ 227,760.00
<br />$
<br />56.30
<br />$
<br />427,429.60
<br />$
<br />42.92
<br />$
<br />325,848.64
<br />$
<br />130.00
<br />$ 120,120.00
<br />$
<br />135.00
<br />$
<br />124,740.00
<br />$
<br />85.00
<br />$
<br />78,540.00
<br />$
<br />24.00
<br />$ 81,696.00
<br />$
<br />31.00
<br />$
<br />105,524.00
<br />$
<br />9.40
<br />$
<br />31,997.60
<br />$
<br />170.00
<br />$ 291,210.00
<br />$
<br />124.00
<br />$
<br />212,412.00
<br />$
<br />86.39
<br />$
<br />147,986.07
<br />$
<br />20,000.00
<br />$ 40,000.00
<br />$
<br />14,200.00
<br />$
<br />28,400.00
<br />$
<br />15,650.29
<br />$
<br />31,300.58
<br />$
<br />15.00
<br />$ 15.00
<br />$
<br />430.00
<br />$
<br />430.00
<br />$
<br />1,099.65
<br />$
<br />1,099.65
<br />$ 2,993,408.46
<br />$
<br />2,799,000.00
<br />$
<br />2,874,323.23
<br />BASE TOTAL $ 2,993,408.46 1 $ 2,799,000.00 1 $ 2,874,323.23
<br />Non -Collusion Affadavit
<br />Y
<br />Y
<br />Bid Bond
<br />Y
<br />Y
<br />M/WBE Inclusion
<br />Y
<br />Y
<br />Addendum #1
<br />Y
<br />Y
<br />Addendum #2
<br />Y
<br />Y
<br />I hereby certify that the above truly and accurately represents bids received for this project on July 25, 2023
<br />Scott Kreeger, Project Engineer
<br />Page 1 of 1