My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2023 Curb and Sidewalk Program Proj No. 123-001 - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Bids
>
Opening of Bids - 2023 Curb and Sidewalk Program Proj No. 123-001 - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:01:13 PM
Creation date
8/8/2023 1:11:22 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SLUSSERS <br />SPECIAL CONDITIONS <br />Concerning the Attached Quotation <br />Quote Number: 2023curbsb <br />STANDARD NOTATIONS: <br />1. Special note concerning seeding: Slusser's will install seed year-round. However, we will not guarantee <br />seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this <br />period is very risky due to extreme climatic conditions (heat/drought/cold/etc.) This note does not apply <br />to prairie or wetland seeding unless specified otherwise. <br />2. This quote is valid for a period of 60 days. <br />3. Lawn maintenance to include mowing or spraying is not included in this quotation. <br />4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation. <br />5. Quantities on this quotation are approximate. Areas will be measured and invoiced per unit prices. <br />6. Performance & Payment bonds are available but not included in this quotation. <br />7. Clearing, grubbing, removal of rocks, debris and existing vegetation is not included in this quotation. <br />8. Seeding or sodding off right-of-way or outside of the construction limits is not included in this quotation. <br />9. Inorganic and Organic soil amendments are not included in this quotation. <br />10. Supplying or installing topsoil, planting soil, engineering soil, or subsoil is not included in this quotation. <br />11. Mulched Seeding partial price includes 100% Kentucky Bluegrass lawn mix, fertilizer, straw mulch, and <br />watering for 30 days only. Topsoil, topsoil placement, or erosion blanket is not included in this price. <br />12. Tree price includes supplying and installing 2"-2.5" Caliper size tree from the pre -approved tree list, staking, <br />hardwood bark mulch, watering for 30 days, and 1 year warranty. <br />13. Maintenance or warranty bond for seeding or tree planting is not included in this quotation. <br />14. Steel edging or weed barrier is not included in this quotation. <br />15. Indiana State Sales Tax has not been included in pricing. <br />16. Traffic control is the responsibility of the contractorfowner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.