My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2023 Curb and Sidewalk Program Proj No. 123-001 - Premium Concrete Services
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Bids
>
Opening of Bids - 2023 Curb and Sidewalk Program Proj No. 123-001 - Premium Concrete Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 12:48:12 PM
Creation date
8/8/2023 1:05:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: 2023 Curb and Sidewalk <br />Project Number: 123-001 <br />For Bids Due: August 81^,2023 <br />Contractor Name: �QE/rt2k/�1 CdNLRETE SER 1trGES <br />DIVISION <br />A <br />Unit <br />Total <br />Item <br />City <br />Unit <br />Price <br />Amount <br />No. <br />Description <br />133 <br />SY <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />SY <br />SO <br />2 <br />CONCRETE SIDEWALK, 4-IN <br />133 <br />`= <br />6d ao <br />3 <br />CONCRETE CURB, REMOVE <br />296 <br />LF <br />= <br />/2t3 <br />4 <br />CONCRETE CURB, MODIFIED <br />296 <br />LF <br />( <br />°" <br />5 <br />CONCRETE APPROACH, REMOVE <br />14 <br />SY <br />D <br />20 <br />6 <br />PCCP FOR APPROACHES 6-IN <br />14 <br />SY <br />dn" <br />O <br />7 <br />CONCRETE CURB RAMP, REMOVE <br />21 <br />SY <br />740 <br />8 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />9 <br />SY <br />9 <br />PAIRED PERPENDICULAR CURB RAMP <br />12 <br />SY <br />LSD= <br />o0 <br />10 <br />TOPSOIL AND SEEDING <br />205 <br />SY <br />3 <br />11 <br />TREE REMOVE 30-IN <br />0 <br />EA <br />PLANT, DECIDUOUS TREE, SINGLE STEM, 2-IN TO <br />12 <br />2.5-IN <br />0 <br />EA <br />DIVISION A (Cl7/ 7 7 C�+ <br />TOTAL � 7 <br />DIVISION <br />DIVISION <br />TOTAL <br />B <br />Unit <br />Total <br />Item <br />Qty <br />Unit <br />Price <br />No. <br />Description <br />877 <br />SY <br />5`O�' <br />1 <br />CONCRETE SIDEWALK, REMOVE <br />2 <br />CONCRETE SIDEWALK, 4-IN898 <br />SY <br />7ll <br />MAnt <br />3 <br />CONCRETE CURB, REMOVE <br />1616 <br />LF <br />2S-4 <br />CONCRETE CURB, MODIFIED1616 <br />LF <br />&25 <br />� <br />CONCRETE APPROACH, REMOVE <br />75 <br />SY <br />bO <br />00 <br />6 <br />BRICK APPROACH REMOVE <br />13 <br />SY <br />/Oo = <br />/ 00 <br />7 <br />ASPHALT APPROACH, REMOVE <br />21 <br />SY <br />/00 <br />ao <br />8 <br />PCCP FOR APPROACHES 6-IN <br />88 <br />SY <br />— <br />2 O <br />9 <br />CONCRETE CURB RAMP, REMOVE <br />21 <br />SY <br />IoO <br />10 <br />ONE-WAY PERPENDICULAR CURB RAMP <br />21 <br />SY <br />1 <br />11 <br />TOPSOIL AND SEEDING <br />1028 <br />SY <br />12 <br />TREE, REMOVE, 10-IN <br />2 <br />EA <br />00 — <br />13 <br />TREE, REMOVE, 18-IN <br />6 <br />EA <br />ob <br />14 <br />TREE, REMOVE, 48-IN <br />1 <br />EA <br />jeco <br />15 <br />STUMP REMOVE <br />2 <br />EA <br />= <br />OGIO <br />PLANT, DECIDUOUS TREE, SINGLE STEM. 2-IN TO <br />16 <br />2.5-IN <br />18 <br />EA <br />B �35� 5'f33'— <br />Version 09/29/2021 Contractor's Bid for Public Works - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.